Immingham Storage Company Limited – East Terminal
No.7 Switchroom - Basis of Design
P & I Design Ltd
DOCUMENT NO: SI451001_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: C DATE: 10.08.12
Tel: + 44 (0)1642 617444
PAGE 2 OF 12
Fax: + 44 (0)1642 616447
www.pidesign.co.ukContents
1
REVISION HISTORY............................................................................................................. 3
2
INTRODUCTION.................................................................................................................... 3
3
ORIGINAL INSTALLATION ................................................................................................ 4
4
MODIFICATIONS COMPLETED ......................................................................................... 5
5
FURTHER PROPOSALS ........................................................................................................ 7
5.1
New ABP 11kV Supply (No.7) – Retain ABP Supply to No.3 (3.3kV).................................. 8
5.2
New ABP 11kV Supply not Available..................................................................................... 9
5.3
Modifications not Reliant on ABP Decision.......................................................................... 10
5.4
No.6 Switchroom ................................................................................................................... 10
6
PROPOSED SWITCHROOM LAYOUT.............................................................................. 11
7
LOAD SCHEDULE............................................................................................................... 12
7.1
Loads Fed from 400A switch EE at No.3 Switchroom.......................................................... 12
7.2
Loads Fed from 400A switch AC at No.3 Switchroom ......................................................... 12