Immingham Storage Company Limited – East Terminal
No.7 Switchroom - Basis of Design
P & I Design Ltd
DOCUMENT NO: SI451001_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: C DATE: 10.08.12
Tel: + 44 (0)1642 617444
PAGE 8 OF 12
Fax: + 44 (0)1642 616447
www.pidesign.co.uk5.1
New ABP 11kV Supply (No.7) – Retain ABP Supply to No.3 (3.3kV)
An option is to obtain a new 11kV supply to the terminal. This would be sited adjacent to
No.7 Switchroom and supply the LV board within. LV supplies would be distributed from
this point to No.3 and No.6 switchrooms, replacing LV supplies at those locations.
If this option became available the order of proposed works is as follows.
1.
Provide new 11000/400V transformer at No.7 Switchroom. LV board is capable of
accepting up to 2MVA transformer.
2.
Build a new LV switchroom adjacent to existing No.3 switchroom and supply this
from No.7 Switchroom LV Board
3.
Transfer loads from existing No.3 switchroom to new switchroom. On completion
the existing No.3 switchroom becomes a dedicated 3.3kV switchroom.
A single line diagram is shown below for this solution.
11kV Supply From ABP
11,000 /
415V
No.7 Switchroom
LV Switchboard
No.6 Switchroom
2MVA
3200A
MCC 1
MCC 2
630A 630A
Aquabio
630A 400A
LV
Board
(Ex
Switch
AC)
LV
Board
(Ex
Switch
EE)
400A 630A
No.3
Switchroom
630A
Spare
1250A
11kV Supply From ABP
No.3 Switchroom
Fire Pump
Starters
415V Tapping no
longer used
3300V
(500kVA)
Future Spares