Immingham Storage Company Limited – East Terminal

No.7 Switchroom - Basis of Design

P & I Design Ltd

DOCUMENT NO: SI451001_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 10.08.12

Tel: + 44 (0)1642 617444

PAGE 9 OF 12

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

5.2

New ABP 11kV Supply not Available

If a new 11kV supply is not available from ABP, there are two scenarios

1.

The existing 11kV supply cannot be uprated

2.

The existing 11kV supply capacity can be increased

In either scenario, the desire is to increase the LV capacity available at No.7 switchroom.

The first step is to transfer the 3.3kV load from the existing transformer at No.3

switchroom to the transformer at No.5 switchroom. This can be achieved by

a.

Relocating the 3.3kV starters to No.5 switchroom 3.3kV Switchboard

b.

Re-supplying the 3.3kV starters in their current location from 3.3kV Board in No.5

Switchroom

The costs involved include :

Option (a) includes switchboard modifications and pump re-cabling, but the

existing No.3 Switchroom can then be used to house new LV switchboards.

Option (b) would require a new LV switchroom to be built adjacent to No.3

Switchroom, in addition to switchboard modifications and cabling requirements.

These two options will require costing in their entirety to permit a decision to be

made.

When the 3.3kV load has been removed from the existing 11kV supply then a new

11000/400V transformer can be installed, either

1.

Sized to utilise the existing 11kV capacity, thus increasing the LV capacity in the

system (from 350kVA to 850kVA) due to the 11kV supply no longer also

supporting the 3.3kV load.

2.

Sized to utilise any increased 11kV capacity made available by ABP. (>850kVA)

In both cases the new transformer would supply an LV board for onward distribution to

No.7 Switchroom. A single line diagram below shows this solution. Note : The decision to

re-supply No.6 switchroom is discussed in section 5.4.

11kV Supply From ABP

11,000 /

400V

No.7 Switchroom

LV Switchboard

No.6 Switchroom

3200A

MCC 1

MCC 2

630A 630A

Aquabio

630A 400A

LV

Board

(Ex

Switch

AC)

LV

Board

(Ex

Switch

EE)

400A 630A

Spare

630A

Spare

1250A

No.3 Switchroom

Future Spares