Immingham Storage Company Limited – East Terminal

No.7 Switchroom - Basis of Design

P & I Design Ltd

DOCUMENT NO: SI451001_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 10.08.12

Tel: + 44 (0)1642 617444

PAGE 7 OF 12

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

5

FURTHER PROPOSALS

It would be desirable to improve the LV capacity to No.7 switchroom. Several options are

available but the decision as to which option is taken depends on a number of factors,

therefore so far as initial phases of work are concerned it is important that the proposals do

not prohibit any of the future options and do not require extensive retrospective work that

would be wasteful financially.

From the flowchart below, showing the decision making process, it can be seen that the

key decisions rely on a response from ABP as to the availability and capacity of HV

supplies. It can also be seen that certain tasks are common regardless of the response from

ABP, an example being the work performed to date in providing a new LV switchboard in

No.7 Switchroom (highlighted green).

START

Provide new LV Switchboard in

No.7 Switchroom

Complete other works as

detailed in Section 5.3

After each step, check if ABP

decision reached before

proceeding to next step

New 11kV Supply available

from ABP ?

No

Decision from ABP re. New

11kV Supply or Increased

Capacity 11kV Supply ?

Yes

No

END

Provide new transformer

adjacent to No.7 Switchroom,

ideally 2MVA & connect to LV

Switchboard, retiring feed

from No.3 switchroom

Complete remaining works as

detailed in Section 5.3

Increased Capacity available

on existing 11kV supply ?

Build new Switchroom

adjacent to No.3.

Transfer LV Loads from No.3

Switchroom.

On completion No.3

switchroom dedicated to

3.3kV, fed from existing

11000/3300/415V transformer

(415V tapping no longer used)

Provide Supply to new

Switchroom from No.7

Switchroom LV Board.

Yes

Re-supply No.6 switchroom

from No.7 switchroom and

retire ABP fed LV supply to

No.6 switchroom

Provide increased LV capacity by

moving 3.3kV load to No.5

Switchroom and provide larger

400V transformer on existing 11kV

supply.

Cost and assess feasibility of

Options (see section 5.2)

Provide new 11000/400V

transformer adjacent to No.3

Switchroom to suit

increased

capacity

Yes

Option 1

Re-locate 3.3kV starters to

No.5 Switchroom

Option 2

Retain 3.3kV starters in No.3

Switchroom and re-supply

from No.5 Switchroom

Build new LV Switchroom

adjacent to No.3 Switchroom.

Fit out with LV boards.

No.3 Switchroom becomes

dedicated 3.3kV

Provide new 11000/400V

transformer adjacent to No.3

Switchroom to suit

existing

capacity

No

Supply No.7 Switchroom LV

Board from new LV board fed

from new transformer,

retiring feed from switch EE

Fit out existing No.3

Switchroom with new LV

boards

Complete remaining works as

detailed in Section 5.3

Transfer LV Loads from No.3

Switchroom to new LV Boards

If additional LV capacity

sufficient. Re-supply No.6

switchroom from No.7

switchroom and retire ABP fed

LV supply to No.6 switchroom