Table of Contents Table of Contents
Previous Page  17 / 164 Next Page
Information
Show Menu
Previous Page 17 / 164 Next Page
Page Background

Immingham Storage Company Limited – East Terminal

No.7 Switchroom - Basis of Design

P & I Design Ltd

DOCUMENT NO: SI451001_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 10.08.12

Tel: + 44 (0)1642 617444

PAGE 11 OF 12

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

6

PROPOSED SWITCHROOM LAYOUT

The LV switchboard has been shown together with reserved space for a future ‘back to

back’ MCC expansion and space for a suite of general purpose floor standing control

panels. Extensive internal cable racking will be included which will provide for all

foreseeable expansion.

Plan View with Racking Removed

Notes

900mm. space allowed for walkway all round

MCC’s would be to the necessary width and extendable towards the double doors

Aquabio

Switchboard

MCC 1

MCC 2

Floor Standing

Control Panels

Logic Panel

etc)

LV Board

Marshalling

Section