In addition to processing the above planning application permits, the Development

Services Tech and POD will also review and sign off on routine building permits,

such as basic accessory structures that meet required setbacks and height limitations.

Figure 8 below, shows the general flow of a typical over-the-counter planning process

for administrative approvals.

Figure 8

General Over-the-Counter Administrative Approval Process

The process typically takes less than 20 minutes, but processing time is not yet

measured (see our below recommendation for establishing a performance measure for

serving walk in customers). The process generally works as follows:

1.

The applicant makes a submittal at the Development Services counter anytime

during normal business hours, Monday through Friday to either the

Development Services Technician (DST) or the Planner on Duty (POD),

whoever is available;

2.

The (DST) or (POD) reviews the submittal against a checklist to make sure it is

complete, meets code requirements and is eligible for over-the-counter

approval;

3.

The Planner logs the project into the log book and the Tide Mark Permit

Tracking, takes in the fee and provides a written receipt;

4.

The (DST) or (POD) may collaborate with building, fire, engineering or others

as needed to review before approving;

Application Submitted at

the Counter to Dev. Serv.

Tech or Planner on Duty

(POD) anytime M-F

Dev. Serv. Tech

or POD Screens

Application for

Requirements/

Eligibility

All

Information

Submitted &

Eligible

Yes

No

Dev. Serv. Tech or

POD may confer with

Engineering, Building,

Fire, Parks Staff as

Required

Dev. Serv. Tech or

POD Stamps / signs

plans/permit; copy to

applicant

Application is

Approved

(stamped) over

the Counter

revise/resubmit

Dev. Serv. Tech

or POD logs into

book; takes fee

and writes receipt

Building Permit

May Be

Required for

Signage