CONSTRUCTION WORLD

FEBRUARY

2016

restaurant industry, Digistics, operates from a 9 000 m

2

distribution facility at

Waterfall Distribution Campus.

In addition, Waterfall Distribution Campus provides ready-to-develop oppor-

tunities, with its services already installed, zoning rights secured and direct power

supply from Eskom.

Waterfall Distribution Campus is a strategically situated 37,2 ha light industrial

zone within in the 323 ha Waterfall, Southern Africa’s largest greenfield urban

development. Waterfall is quickly becoming one of the strongest and most

successful commercial nodes nationally. It is ideally located between Johannes-

burg and Pretoria with excellent visibility and accessibility, being close to major

road networks.

Of the 1,8 million square metres of developable bulk approved at

Waterfall so far, 145 000 m

2

of development rights are in Waterfall

Distribution Campus. Commenting on the project, Atterbury Property Devel-

opments’ director, Coenie Bezuidenhout, who is co-ordinating the Waterfall

mega-development on behalf of Attacq, says: “Waterfall is an unrivalled loca-

tion. Its businesses benefit from the latest designs and operational efficiencies.

Torre is joining an increasing number of industrial companies taking advantage

of the distinct rewards of doing business at Waterfall.”

Morné Wilken, CEO of Attacq, says: “We are delighted that JSE-listed Torre

Industries has chosenWaterfall for Torre Lifting Solutions’ new headquarters. Torre

will be yet another great addition to the impressive and growing list of leading

businesses at Waterfall. As we develop the remaining 1,4 million square metres

of usable bulk at Waterfall over the next 10 to 15 years, this prime development is

creating a city crafted around the best urban design principles.”

Mitsubishi Hitachi Power

Systems Africa found the

ideal solution in the Orbit

personnel and material

hoists which enable the

contractor to provide safe,

effective and efficient

services at its contract at

Kusile Power Station.

The Orbit personnel and material hoists from Torre Lifting Solutions overcome the

challenge of moving both people and materials to levels where critical activities

need to be performed, in a safe and productive manner.