Ten-Year Network Development Plan 2017 Main Report |

145

Based on the experience of TYNDP 2015 and 2

nd

PCI selection process, ENTSOG

identified that the High Infrastructure level, due to the elevated number of compet-

ing initiatives included, had limited added-value, for both the TYNDP Energy System

Wide assessment and the Project-Specific cost-benefit analysis of projects. How­

ever, the infrastructure level is maintained in line with the CBA methodology in force.

Yet, following ACER Opinion on TYNDP 2015 on better and more realistic handling

of projects, the Assessment Chapter covers the comprehensive evaluation of the

Low, Advanced and 2

nd

PCI list Infrastructure Levels. Results of the assessment of

the High Infrastructure Level are made available in Annex E.

In line with the TEN-E Regulation and the CBA methodology the TYNDP provides a

common basis for the Project-Specific CBA of each PCI candidate (see Annex F).

This involves the assessment of different infrastructure levels of the gas infrastruc-

ture based on the level of maturity and PCI status of the projects. The TYNDP will be

used by the Regional Groups as a background when considering the Project Specif-

ic CBAs of the candidate projects for the 3

rd

PCI List.

EXISTING

INFRASTRUCTURE

LOW

Minimum development of

infrastructure common to

all levels

ADVANCED

2nd PCI LIST

Assessment as a whole of the projects

belonging to each Infrastructure Level

HIGH

FID PROJECTS

FID PROJECTS

FID PROJECTS

FID PROJECTS

EXISTING

INFRASTRUCTURE

EXISTING

INFRASTRUCTURE

EXISTING

INFRASTRUCTURE

ADVANCED

NON-FID

PROJECTS

LESS-ADVANCED

NON-FID

PROJECTS

ADVANCED

NON-FID

PROJECTS

2nd PCI LIST

NON-FID

PROJECTS

Assessment of the

Infrastructure

needs

Figure 4.1:

Infrastructure Levels