Ten-Year Network Development Plan 2017 Main Report
4.5.3 PROJECTS COMMISSIONED SINCE TYNDP 2015
The following map shows all projects from TYNDP 2015 that have been complet-
ed. Nine projects were from the PCI 1st List.
Reverse flow at GR-BG border
Support to north-west market
From PCI 1st List
Gas Compressor Optimisation Program
Slovakia – Hungary interconnection
Capacity enhancement of
Klaipėda – Kiemenai pipeline in Lithuania
Expansion of existing gas transmission capacity
in the direction to Denmark – Step 1 and 2
Arc de Dierrey
• Alveringem – Maldegem
• Reverse Capacity from France to Belgium at Alveringem
Carriço UGS development
CS Border at Biriatou
Nordschwarzwaldleitung
Artère de l‘Adour (former Euskadour)
(FR-ES interconnection)
Girland – Artère de Guyenne Phase B
Developments for the
Dunkerque LNG
Gas Storage Bergermeer
Dunkerque LNG
Klaipėda LNG
Świnoujście LNG
Compressor Station
Pipeline
LNG
Storages
Figure 4.3:
Map of commissioned projects between TYNDP 2015 and TYNDP 2017