Ten-Year Network Development Plan 2017 Main Report

34

52

148

FID

Advanced Non-FID

Less-Advanced Non-FID

Total: 234

0

160

140

100

80

60

40

20

FID

Advanced Non-FID Less-Advanced Non-FID

UGS

TRA

LNG

Figure 4.7:

Breakdown of projects in TYNDP 2017 by infrastructure type and project status

Total: 234

6 12 8

22

87

99

PCI – LNG

Non-PCI – LNG

PCI – Transmission

Non-PCI – Transmission

PCI – UGS

Non-PCI – UGS

Figure 4.6:

Breakdown of the projects in TYNDP 2017 per

2

nd

PCI List and per type of infrastructure

Completed

Cancelled or

not-resubmitted

19

9

18

Total: 46

TYNDP 2015 FID projects

Re-confirmed

Figure 4.5:

Comparison of project with FID status in TYNDP 2017 and TYNDP 2015

New projects

Re-confirmed from TYNDP 2015

Took the FID in the last years

6

10

18

Total: 34

TYNDP 2017 FID projects

Table 4.2:

Breakdown of projects in TYNDP 2017 by

FID status and PCI status

BREAKDOWN OF PROJECTS IN TYNDP

2017 BY FID STATUS AND PCI STATUS

PCI

Non-PCI

FID

10

24

NON-FID

91

109

TOTAL

101

133

The share of projects with FID status has slightly decreased with respect to the

TYNDP 2015.

Among the submitted projects 10 projects with FID status and 91 projects with non-

FID status are part of the 2

nd

PCI List.

As previously covered in this chapter, there are three defined project status (FID,

Advanced Non-FID and Less Advanced Non-FID). Figure 4.7 shows the breakdown

of the projects by status and type of infrastructure.