150 |
Ten-Year Network Development Plan 2017 Main Report
34
52
148
FID
Advanced Non-FID
Less-Advanced Non-FID
Total: 234
0
160
140
100
80
60
40
20
FID
Advanced Non-FID Less-Advanced Non-FID
UGS
TRA
LNG
Figure 4.7:
Breakdown of projects in TYNDP 2017 by infrastructure type and project status
Total: 234
6 12 8
22
87
99
PCI – LNG
Non-PCI – LNG
PCI – Transmission
Non-PCI – Transmission
PCI – UGS
Non-PCI – UGS
Figure 4.6:
Breakdown of the projects in TYNDP 2017 per
2
nd
PCI List and per type of infrastructure
Completed
Cancelled or
not-resubmitted
19
9
18
Total: 46
TYNDP 2015 FID projects
Re-confirmed
Figure 4.5:
Comparison of project with FID status in TYNDP 2017 and TYNDP 2015
New projects
Re-confirmed from TYNDP 2015
Took the FID in the last years
6
10
18
Total: 34
TYNDP 2017 FID projects
Table 4.2:
Breakdown of projects in TYNDP 2017 by
FID status and PCI status
BREAKDOWN OF PROJECTS IN TYNDP
2017 BY FID STATUS AND PCI STATUS
PCI
Non-PCI
FID
10
24
NON-FID
91
109
TOTAL
101
133
The share of projects with FID status has slightly decreased with respect to the
TYNDP 2015.
Among the submitted projects 10 projects with FID status and 91 projects with non-
FID status are part of the 2
nd
PCI List.
As previously covered in this chapter, there are three defined project status (FID,
Advanced Non-FID and Less Advanced Non-FID). Figure 4.7 shows the breakdown
of the projects by status and type of infrastructure.