Ten-Year Network Development Plan 2017 Main Report |

149

4.5.4 OVERVIEW PER PROJECT STATUS

When compared to the 279 projects submitted for TYNDP 2015 we observe a

reduction to 234 projects submitted for inclusion in the 2017 edition.

This reduction stems, in part, for the requirement introduced by ENTSOG for TYNDP

2017 that projects being part of the previous TYNDP need to be actively resubmit-

ted to be part of the current TYNDP. This has allowed identifying projects that were

not active anymore but for which promoters had missed to previously report the

information to ENTSOG.

The following figures and tables provide a statistical overview of the projects (see

Annex A for project details) based on information such as the type of infrastructure

or the FID/PCI status. Those reports reflect all details entered as part of the data

collection process explained above.

LNG Terminal – FID

LNG Terminal – Non-FID

Storage Facility – FID

Storage Facility – Non-FID

Transmission – FID

Transmission – Non-FID

TYNDP 2015

TYNDP 2017

7

14%

70%

16%

32

29

172

Projects

24

15

0,0

0,2

0,4

0,6

0,8

5

13%

79%

8%

25

15

160

Projects

26

3

Figure 4.4:

Comparison of project submission in TYNDP 2017 and TYNDP 2015 per type of

infrastructure and FID status. The inner circle represents absolute numbers;

the outer circle represents the share of each project type.

The above graph refers to the only two project status defined in TYNDP 2015: FID

and non-FID. We observe a reduction in LNG and UGS projects, but an increase in

pipeline projects. Around 60% of new transmission projects refer to South-East

Europe and the Baltic region. Several projects, especially for storage facilities, were

cancelled or not re-submitted.

NUMBER OF PROJECTS FROM TYNDP 2015 COMPLETED,

STILL PLANNED, NOT-RESUBMITTED AND CANCELLED

UGS

LNG

TRA

COMPLETED

2

3

15

STILL PLANNED

15

26

134

NOT RE-SUBMITTED

14

5

7

CANCELLED

13

5

40

Table 4.1:

Number of projects from TYNDP 2015 completed, still planned, not-resubmitted and

cancelled