Benefits
Main Driver
Market Demand
Main Driver Explanation
Benefit Description
PCI Details
PCI Benefits
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation
prior to the commissioning of the project, Project concerns investment in reverse flow capacity
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Murfeld
The technical load factor of the pipeline is confidential and
must not be published in the TYNDP.
Total
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
Market Test
Permitting
10/2015
07/2017
Supply Contracts
FID
Construction
11/2019
Commissioning
2019
2019
NDP and PCI Information
Part of NDP
Yes (NDP 2016 - 2025)
NDP Number
GCA 2015/08
Currently PCI
Yes (6.26.4)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%