Table of Contents Table of Contents
Previous Page  20-21 / 1248 Next Page
Information
Show Menu
Previous Page 20-21 / 1248 Next Page
Page Background

TAG Reverse Flow

General Information

Promoter

Trans Austria Gasleitung

GmbH

Operator

TAG GmbH

Host Country

Austria

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

Trans Austria Gasleitung GmbH

100%

TRA-N-954

Project

Pipeline including CS

Non-FID

Update Date

25/05/2016

Non-Advanced

Description

The objective of the planning project ´TAG Reverse Flow´ is to create a reverse flow on the TAG GmbH pipeline system with three project variations:

1a Reverse Flow by upgrading existing entry DZK capacity to entry FZK capacity at the IP Arnoldstein/Tarvisio and additionally by allowing potential

entry FZK capacity at the IP Ceršak/Murfeld. Physical interconnection capacity via an exit from the TAG GmbH pipeline system to the Gas Connect

Austria GmbH subsystem PVS-AZ1. 1b Reverse Flow by upgrading existing entry DZK capacity to entry FZK capacity at the IP Arnoldstein/Tarvisio.

Physical interconnection between the TAG pipeline system to the Gas Connect Austria subsystem PVS-AZ1. Further, the project shall also enable a

physical connection at the IP Baumgarten at the Austrian/Slovakian boarder by upgrading existing backhaul capacity ´Exit Baumgartenµ to FZK

capacity ´Exit Baumgartenµ of TAG GmbH. 1c This variation of the project is a combination of project variation 1a and 1b.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Baumgarten

TAG GmbH

2018

AT

SK

268.6 GWh/d

Comment: The project enable a physical connection at the IP Baumgarten (TAG

GmbH/eustream a.s.) at the Austrian/Slovakian boarder by upgrading existing backhaul

capacity ´Exit Baumgartenµ to FZK capacity ´Exit Baumgartenµ of TAG GmbH

Tarvisio (IT) / Arnoldstein (AT)

TAG GmbH

2018

IB-ITe

AT

0.0 GWh/d

Comment: Reverse Flow by upgrading existing entry DZK capacity to entry FZK capacity at the

IP Arnoldstein/Tarvisio and additionally by allowing potential entry FZK capacity at the IP

Ceršak/Murfeld.

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 10 of 620

Current TYNDP : TYNDP 2017 - Annex A