Benefits
Main Driver
Market Demand
Main Driver Explanation
Pipeline projects are planned according to market demand. Current planning is based on market indications.
Benefit Description
Strenthening the establishment of a potential Southern Corridor and contribution to a diversification of sources e.g. Black Sea Gas.
PCI Details
PCI Benefits
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Mosonmagyarovar
The technical load factor of the pipeline is confidential and
must not be published in the TYNDP.
Total
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
Market Test
Permitting
10/2015
07/2017
Supply Contracts
FID
Construction
10/2020
Commissioning
2020
2020
NDP and PCI Information
Part of NDP
Yes (NDP 2016 - 2025)
NDP Number
GCA 2015/05
Currently PCI
Yes (6.24.3)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
Yes
Exemption Granted
Yes
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%