Trans-Caspian
General Information
Promoter
W-Stream Caspian Pipeline
Company Ltd
Operator
W-Stream Caspian Pipeline
Company Ltd
Host Country
Turkmenistan
Status
Planned
Website
Project's URLPublication Approval Status
Approved
Sponsors
W-STREAM PIPELINE COMPANY LIMITED
100%
TRA-N-339
Project
Pipeline including CS
Non-FID
Update Date
08/07/2016
Non-Advanced
Description
TCP will branch-off at a connection with the East-West pipeline or for the first stage from a collection point of the offshore Caspian
production/treatment in Turkmenistan. It will feed into Sangachal terminal and SCP-X (SCP-(F)X at a later stage). Several economically justified
scenarios of TCP's step by step expansion are possible. A first early gas stage associated with one pipeline string is intended to transport 8-10 bcm/y
towards Turkey (TANAP). Later on, the capacity is intended to be increased to up to 30-32 bcm/y and feed both Turkish (TANAP) and cross-Black Sea
(via White Stream towards Baumgarten) directions. We are currently evaluating 2 options: a) 3 phased development, each for 10 bcm/y, with three
30in strings to be installed over time, b) 2 phased development, each for 15 bcm/y , with two 34in strings. Estimated costs: a) for 3x30in pipelines +
one compression station terminal -€ 2 billion. b) for 2x34in pipelines + one compression station and terminal -€ 1.5 billion.
Regulatory Decisions and
similar material conditions
ENTSOG Remarks
The project does not lie in the geographical perimeter of the TYNDP retained for
modeling.
Enabled Projects
Project Code Project Name
TRA-N-053 White Stream
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 610 of 620
Current TYNDP : TYNDP 2017 - Annex A