Table of Contents Table of Contents
Previous Page  1238-1239 / 1248 Next Page
Information
Show Menu
Previous Page 1238-1239 / 1248 Next Page
Page Background

Poland-Ukraine Interconnector (Ukrainian section)

General Information

Promoter

PJSC Ukrtransgaz

Operator

Ukrtransgaz

Host Country

Ukraine

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

Ukrtransgaz

100%

TRA-N-561

Project

Pipeline including CS

Non-FID

Update Date

24/05/2016

Non-Advanced

Description

The objective of the project is to create a large transportation corridor between Poland and Ukraine which will contribute towards: ‡ establishment of

a well-integrated gas market in the region (PL, UA, CZ, SK, HU, RO, MDA) ‡ diversification of gas routes and sources for Ukraine ‡ enhancement of

security of gas supply for Ukraine ‡ reducing dependency on single gas supplier for Ukraine ‡ strengthening energy solidarity between EU Energy

Community and EU contracting countries ‡ access to the gas storages in Ukraine for Poland and the EU countries Using Interconnector in forward

and reverse direction will enable inject and withdraw natural gas from Ukrainian UGS for foreign owners up to 15 billion cubic meters.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

PL>UA Interconnector

Ukrtransgaz

2019

PL

UAe

245.0 GWh/d

UA>PL Interconnector

Ukrtransgaz

2019

UA

PL

215.0 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 616 of 620

Current TYNDP : TYNDP 2017 - Annex A