Expected Gas Sourcing

Norway, LNG (QA,US)

Benefits

Main Driver

Market Demand

Main Driver Explanation

Introduction of pipeline interconnector with capacity to 8 bcm/year will allow to increase technical abilities of gas import by Ukraine from European

countries by 40% (to 29.6 bcm/year). Resolution of the issue of connection of existing pipelines and planned interconnectors of four Vyshegrad States to

the West part of Ukrainian GTS and Ukrainian underground storage facilities makes it possible to create the powerful East-European gas hub. Pipeline

LQWHUFRQQHFWRU ZLOO DOORZ IRU 8NUDLQH WR SXUFKDVH QRW QO\ 5XVVLDQ JDV EXW DOVR JDV WKURXJK WKH /1* WHUPLQDO LQ ĞZLQRXMğFLH IURP 4DWDU WKH 8QLWHG 6WDWHV

etc. and gas from Norway.

PCI Details

PCI Benefits

General Criteria Fulfilled

No

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Drozdovychi - Bilche Volytsya

1,000

110

Total

110

Schedule

Start Date

End Date

Pre-Feasibility

12/2014

Feasibility

12/2014

12/2015

FEED

05/2016

01/2017

Market Test

Permitting

01/2017

12/2017

Supply Contracts

FID

04/2017

Construction

01/2018

11/2019

Commissioning

2019

2019

NDP and PCI Information

Part of NDP

Yes (Ten-Year Network Development Plan

of UTG)

NDP Number

N/A

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Not Applicable

Considered Tariff Regime

Not Applicable

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 617 of 620

Current TYNDP : TYNDP 2017 - Annex A