Benefits
Main Driver
Market Demand
Main Driver Explanation
Benefit Description
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
C4G - DE/CZ
The project comprises several technical measures, which leads
factually to entry capacity increase between DE (Gaspool) and
CZ. The incremental capacity represents approx. entry capacity
extension between the market areas of DE (Gaspool) and CZ.
Total
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
10/2015
06/2018
Market Test
02/2016
Permitting
Supply Contracts
FID
Construction
Commissioning
2019
2020
NDP and PCI Information
Part of NDP
Yes (NDP 2017-2026 (new project))
NDP Number
TRA-N-752
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 66 of 620
Current TYNDP : TYNDP 2017 - Annex A