Capacity4Gas (C4G) ² CZ/AT
General Information
Promoter
NET4GAS, s.r.o.
Operator
NET4GAS, s.r.o.
Host Country
Czechia
Status
Planned
Website
Publication Approval Status
Approved
Sponsors
Austria
GAS CONNECT AUSTRIA GmbH
100%
Czech Republic
NET4GAS, s.r.o.
100%
TRA-N-919
Project
Pipeline including CS
Non-FID
Update Date
06/05/2016
Advanced
Description
The project Capacity4Gas (C4G) represents 3 specific projects, which deal with increase of cross-market capacities at 3 different borders and were
developed in the context of a non-binding market survey performed at the beginning of 2016. The market survey was focused on an assessment of
the need for new transmission capacity between the Czech Republic and adjacent market areas. The 3 projects are (1) C4G ² DE/CZ, i.e. entry capacity
increase between DE (Gaspool) and CZ, (2a) C4G ² CZ/SK, i.e. exit capacity increase between CZ and SK, (2b) C4G ² CZ/AT, i.e. exit capacity increase
between CZ and AT. The projects (2a) and (2b) are alternatives.
Regulatory Decisions and
similar material conditions
Enabled Projects
Project Code Project Name
TRA-N-133 Bidirectional Austrian Czech Interconnection (BACI)
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
3RäWRUQi 5HLQWDO
NET4GAS, s.r.o.
2020
CZ
AT
1,000.0 GWh/d
Comment: The incremental capacity represents approx. exit capacity extension above planned
exit capacity of the project BACI at CZ/AT border (the project C4G ² CZ/AT is an alternative to
exit capacity extension at CZ/SK border, the project C4G ² CZ/SK).