Capacity4Gas (C4G) ² CZ/AT

General Information

Promoter

NET4GAS, s.r.o.

Operator

NET4GAS, s.r.o.

Host Country

Czechia

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

Austria

GAS CONNECT AUSTRIA GmbH

100%

Czech Republic

NET4GAS, s.r.o.

100%

TRA-N-919

Project

Pipeline including CS

Non-FID

Update Date

06/05/2016

Advanced

Description

The project Capacity4Gas (C4G) represents 3 specific projects, which deal with increase of cross-market capacities at 3 different borders and were

developed in the context of a non-binding market survey performed at the beginning of 2016. The market survey was focused on an assessment of

the need for new transmission capacity between the Czech Republic and adjacent market areas. The 3 projects are (1) C4G ² DE/CZ, i.e. entry capacity

increase between DE (Gaspool) and CZ, (2a) C4G ² CZ/SK, i.e. exit capacity increase between CZ and SK, (2b) C4G ² CZ/AT, i.e. exit capacity increase

between CZ and AT. The projects (2a) and (2b) are alternatives.

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

TRA-N-133 Bidirectional Austrian Czech Interconnection (BACI)

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

3RäWRUQi 5HLQWDO

NET4GAS, s.r.o.

2020

CZ

AT

1,000.0 GWh/d

Comment: The incremental capacity represents approx. exit capacity extension above planned

exit capacity of the project BACI at CZ/AT border (the project C4G ² CZ/AT is an alternative to

exit capacity extension at CZ/SK border, the project C4G ² CZ/SK).