Benefits

Main Driver

Market Demand

Main Driver Explanation

Benefit Description

Increase of the transmission capacity from the Open Grid Europe grid to the bayernets grid, the terranets bw grid, the Thyssengas grid and the

underground gas storages Etzel in Germany as well as the underground gas storages 7Fields and Haidach in Austria. Support of the transmission of high-

calorific gas to regions which are currently supplied by declining low-calorific gas. Increase of the transmission capacity from the Open Grid Europe grid to

Denmark at the cross-border point Ellund.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Compressor station "Herbstein"

39

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 88 of 620

Current TYNDP : TYNDP 2017 - Annex A