Technical Information (LNG)
LNG Facility
Tallinn LNG
Expected Volume (bcm/y)
4
Storage Capacity (m3)
160,000
Ship Size (m3)
160,000
Terminal berths can recieve any size LNG carrier on the market
Reloading Ability
No
PCI Details
PCI Benefits
Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at
supplying directly or indirectly at least two Member States
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Schedule
Start Date
End Date
Pre-Feasibility
09/2012
Feasibility
FEED
Market Test
Permitting
Supply Contracts
FID
Construction
Commissioning
2019
2019
NDP and PCI Information
Part of NDP
No (Valid energy NDA ENMAK 2020
foresees the diversification of energy
supply via
construction of LNG terminals p.18 The
construction of LNG infrastructure is on
the list of foremost measures p.40 and
activities p.41 As this NDA was adopted
in 2009 no specific PCI projects could be
listed.)
NDP Number
Currently PCI
Yes (8.1.2.3)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
Not Yet
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%