Technical Information (LNG)

LNG Facility

Tallinn LNG

Expected Volume (bcm/y)

4

Storage Capacity (m3)

160,000

Ship Size (m3)

160,000

Terminal berths can recieve any size LNG carrier on the market

Reloading Ability

No

PCI Details

PCI Benefits

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at

supplying directly or indirectly at least two Member States

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Schedule

Start Date

End Date

Pre-Feasibility

09/2012

Feasibility

FEED

Market Test

Permitting

Supply Contracts

FID

Construction

Commissioning

2019

2019

NDP and PCI Information

Part of NDP

No (Valid energy NDA ENMAK 2020

foresees the diversification of energy

supply via

construction of LNG terminals p.18 The

construction of LNG infrastructure is on

the list of foremost measures p.40 and

activities p.41 As this NDA was adopted

in 2009 no specific PCI projects could be

listed.)

NDP Number

Currently PCI

Yes (8.1.2.3)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

Not Yet

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 136 of 620

Current TYNDP : TYNDP 2017 - Annex A