Time Schedule

Grant Obtention Date

19/01/2016

PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

No

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

ENTSOG PS-CBA demonstrates visible benefits for MidCat. ‡ A better market integration of the Iberian Peninsula will be traduced by a price

convergence between Spain and France. ‡ Regarding competition, with the MidCat project France will improve the possibility to take benefit

from a cheaper LNG price or Algerian gas. ‡ At European level, the MidCat project can be considered as a way to reduce the dependency from

Russian gas and therefore to improve the overall security of supply, as it reinforce the direct link between North Africa and Europe. ‡ This

project improves the CO2 emissions in several cases by making the gas cheaper than coal and replacing coal in specific zones.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Loop Castelnou ² Villar de Arnedo + CS Zaragoza

(increment)

Date of Comissioning: December 2022

640

214

5

Loop Tivissa ² $UEyV &6 7LYLVVD ILOWHUV &6 $UEyV

(increment)

Date of Comissioning: December 2022

740

114

21

Total

328

26

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

01/2008

01/2010

FEED

01/2018

05/2019

Market Test

03/2018

Permitting

09/2018

12/2020

Supply Contracts

FID

05/2019

Construction

01/2021

12/2022

Commissioning

2022

2022

NDP and PCI Information

Part of NDP

<HV &RQH[LyQ LQWHUQDFLRQDO FRQ )UDQFLD

SRU &DWDOXxD

NDP Number

No code in the NDP

Currently PCI

Yes (5.5)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 169 of 620

Current TYNDP : TYNDP 2017 - Annex A