PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Security of Supply

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Castropodame - Zamora

600

170

Guitiriz - Lugo

740

28

Lugo - Villafranca del Bierzo

740

90

Villafranca del Bierzo - Castropodame

740

30

Zamora - La Barbolla - Adradas

800

307

Total

625

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

FEED

01/2017

05/2018

Market Test

03/2018

Permitting

Supply Contracts

FID

Construction

Commissioning

2025

2025

NDP and PCI Information

Part of NDP

No (The project was not included in the

last NDP that was published in 2008. The

project was identified later on, and was

selected as PCI by the European

Commission in 2013 and in 2015.

Additionally, this project is being

considered in the High Level Group on

Interconnections for South-West Europe. )

NDP Number

Currently PCI

Yes (5.4)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 172 of 620

Current TYNDP : TYNDP 2017 - Annex A