Balticconnector Finnish part

TRA-N-928

Project

Pipeline including CS

Non-FID

Update Date

24/05/2016

Advanced

Description

New bidirectional offshore pipeline (Inkoo-Paldiski, DN500, 80 bar) of 80 km, plus 50 km onshore pipeline in EE (Kiili-Paldiski pipeline, DN 700, 55

bar) and 20 km onshore pipeline in FI (Siuntio-Inkoo pipeline, DN500, 80 bar) including metering and compressor stations at both ends with a daily

nominal capacity of 7.2 mcm/day. The power of each compressor station is about 10 MW.

Regulatory Decisions and

similar material conditions

The Regulators of Finland (Energiavirasto ) and Estonia (Konkurentsiamet) have made a common CBCA decision for the Balticconnector and Estonia-

Latvia interconnection project.

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Balticconnector / Siuntio (FI)

Baltic Connector Oy

2019

FI

FI/BAC

79.0 GWh/d

Baltic Connector Oy

2019

FI/BAC

FI

79.0 GWh/d

Balticonnector / Paldiski (EE)

Baltic Connector Oy

2019

EE

FI/BAC

79.0 GWh/d

Baltic Connector Oy

2019

FI/BAC

EE

79.0 GWh/d