Expected Gas Sourcing
Algeria, LNG (WO)
PCI Details
PCI Benefits
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation
prior to the commissioning of the project, Project concerns investment in reverse flow capacity
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Guitiriz Zamora
It is necessary the increase of the compressor station of
Zamora. This infrastructure should be associated to the third
Interconnection point with Portugal
762
320
16,840
Total
320
16,840
Schedule
Start Date
End Date
Pre-Feasibility
01/2017
Feasibility
01/2017
06/2017
FEED
06/2017
06/2018
Market Test
06/2017
Permitting
06/2017
01/2019
Supply Contracts
01/2019
FID
01/2019
Construction
01/2019
01/2020
Commissioning
2020
2020
NDP and PCI Information
Part of NDP
No (The last approved Spanish NDP ended
in 2016. The Royal Decree-Law 13/2012
cancel the process of obtaining
administrative authorization to transport
pipelines and metering regulation stations
even if they were included in this NDP.This
Project was included in the NDP 2008-
2016.)
NDP Number
N/A
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 175 of 620
Current TYNDP : TYNDP 2017 - Annex A