Table of Contents Table of Contents
Previous Page  70-71 / 1248 Next Page
Information
Show Menu
Previous Page 70-71 / 1248 Next Page
Page Background

A project for the construction of a gas pipeline BG-RO

General Information

Promoter

Bulgartransgaz EAD

Operator

Bulgartransgaz EAD

Host Country

Bulgaria

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Bulgartransgaz EAD

100%

TRA-N-379

Project

Pipeline including CS

Non-FID

Update Date

22/06/2016

Non-Advanced

Description

The project is part of the concept for coordinated development of gas transmission networks of Bulgaria, Romania and Hungary (transport corridor

Bulgaria-Romania-Hungary-Austria), designed for the bi-lateral natural gas transport between the countries. The project on the territory of Bulgaria

includes the construction of a new infrastructure and modernization and expansion of the existing network in order to increase the capacity of

interconnectivity of the northern semi-ring of the national gas transmission network of Bulgartransgaz EAD and the gas transmission network of

Transgaz S.ǧ Romania. The implementation of the Bulgarian section together with the existing gas transmission infrastructure is expected to ensure

the technical possibilities for supply of natural gas between 3 - 5 bcm/y between the planned entry points on Bulgaria·s southern border and

between Romania and Hungary, with an opportunity for access to the Central European gas market.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

New IP Bulgaria (BG) / Romania (RO) (3)

Bulgartransgaz EAD

2018

BGn

RO

85.0 GWh/d

Bulgartransgaz EAD

2018

RO

BGn

85.0 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 35 of 620

Current TYNDP : TYNDP 2017 - Annex A