Table of Contents Table of Contents
Previous Page  64-65 / 1248 Next Page
Information
Show Menu
Previous Page 64-65 / 1248 Next Page
Page Background

Interconnector Greece-Bulgaria (IGB Project)

TRA-F-378

Project

Pipeline including CS

FID

Update Date

06/05/2016

Advanced

Description

Construction of a bi-directional gas interconnector between the high pressure natural gas systems of Greece and Bulgaria with a technical forward

capacity of 3bcm/y, capable to be increased to 5 bcm/y with the installation of a Compressor Station

Regulatory Decisions and

similar material conditions

The current market test is conducted under guidelines and notice approved and issued by the National Regulatory Authorities in accordance to art.

36 of the 2009/73/EC gas directive: RAE decision No.438/23.11.2015 , EWRC decision No.y-2/27.11.2015 : ´Updated Guidelines for management and

allocation of capacity on the IGB INTERCONNECTOR according to paragraph 6 of article 36 of Directive 2009/73/EC ² PHASE I: Invitation of

interested parties to express their interest in reserving capacity). RAE decision No.472/1.12.2015, EWRC decision No.y-3/10.12.2015): "EoI Notice"

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Komotini - TAP / IGB

ICGB a.d.

2018

GR/TAP

BG/IGB

90.0 GWh/d

Comment: Initial capacity of 3 bcm/y

ICGB a.d.

2021

GR/TAP

BG/IGB

60.5 GWh/d

Comment: Added by ENTSOG to match the exit at Stara Zagora

Komotini (DESFA) - GR / IGB

ICGB a.d.

2018

IB-GRk

BG/IGB

90.0 GWh/d

Comment: Increment could also be done in correlation with DESFA

ICGB a.d.

2021

IB-GRk

BG/IGB

60.5 GWh/d

Comment: With relevant committmens from the market and necessary upgrades in the TSOs to

be interconnected with IGB, the IGB transportation capacity could be increased from up to

3bcm/y to up to 5 bcm/y forward capacity by installing a Compressor Station.

Stara Zagora - IGB / BG

ICGB a.d.

2018

BG/IGB

BGn

90.0 GWh/d

Comment: Initial capacity of 3 bcm/y

ICGB a.d.

2021

BG/IGB

BGn

60.5 GWh/d

Comment: With relevant committmens from the market and necessary upgrades in the TSOs to

be interconnected with IGB, the IGB transportation capacity could be increased from up to

3bcm/y to up to 5 bcm/y forward capacity by installing a Compressor Station.

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 32 of 620

Current TYNDP : TYNDP 2017 - Annex A