Rehabilitation, Modernization and Expansion of the NTS
General Information
Promoter
Bulgartransgaz EAD
Operator
Bulgartransgaz EAD
Host Country
Bulgaria
Status
Planned
Website
Project's URLPublication Approval Status
Approved
Sponsors
Bulgartransgaz EAD
100%
TRA-N-298
Project
Pipeline including CS
Non-FID
Update Date
22/06/2016
Non-Advanced
Description
A multicomponent project which consists of different actions for rehabilitation, modernization and expansion of the existing gas transmission
infrastructure in Bulgaria and includes activities on: CSs modernization, inspections, repair and replacement of pipeline sections, expansion of the
existing network and implementation of systems for optimization of the management process of the network technical condition. Taking into
account the complex nature of the project, a 3 phases implementation is envisaged: Phase 1: Unifies the actions undertaken in the period 2013-2015,
planned to be finalized in a short term and funded with BTG own resources. Phase 2: Includes actions planned to be initiated in 2016. They represent
logic continuation of the overall realization of the project following the implementation of Phase 1. Phase 3: Conditional infrastructure necessary
after taking the FID for stage 2 of the Interconnection Bulgaria ² Serbia.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Interconnector BG RS
IBS Future Operator
2020
BGn
RS
19.4 GWh/d
Comment: infrastructure necessary for stage 2 of the Interconnection Bulgaria ² Serbia.
IBS Future Operator
2020
RS
BGn
19.4 GWh/d
Comment: infrastructure necessary for stage 2 of the Interconnection Bulgaria ² Serbia.
Kulata (BG) / Sidirokastron (GR)
Bulgartransgaz EAD
2020
BGg/BGT
GR
13.8 GWh/d
Strandzha (BG) / Malkoclar (TR)
Bulgartransgaz EAD
2020
BGg/BGT
TRe
58.1 GWh/d