Looping CS Valchi Dol - Line valve Novi Iskar

General Information

Promoter

Bulgartransgaz EAD

Operator

Bulgartransgaz EAD

Host Country

Bulgaria

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Bulgartransgaz EAD

100%

TRA-N-592

Project

Pipeline including CS

Non-FID

Update Date

27/05/2016

Non-Advanced

Description

Looping to CS Valchi dol ² line valve Novi Iskar: Modernisation of the national gas transmission network norther semi-ring with the construction of

383 km looping with a diameter of Dn 700 from CS Valchi dol to line valve Novi Iskar. The realization of the project will ensure new exit capacity of 4

bcm/y (128,3 GWh/d) in the direction to Romania (through IBR) and Chiren UGS (for transmission during injection and withdrawal amounting to 500

mcm/y). In the context of the European objectives to build an interconnected and single pan-European marker, the realization of the presented

projects, forming the gas hub concept, is in line with the projects for the development of the Southern gas corridor and in full compliance with the

plans for development of gas infrastructure in Europe to enhance the security of supply and the diversification of natural gas supply sources.

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

UGS-N-138 UGS Chiren Expansion

TRA-F-057 Interconnection Bulgaria²Romania

TRA-N-593 Varna-Oryahovo gas pipeline

TRA-N-594 Construction of a Looping CS Provadia ² Rupcha village