Looping CS Valchi Dol - Line valve Novi Iskar
General Information
Promoter
Bulgartransgaz EAD
Operator
Bulgartransgaz EAD
Host Country
Bulgaria
Status
Planned
Website
Project's URLPublication Approval Status
Approved
Sponsors
Bulgartransgaz EAD
100%
TRA-N-592
Project
Pipeline including CS
Non-FID
Update Date
27/05/2016
Non-Advanced
Description
Looping to CS Valchi dol ² line valve Novi Iskar: Modernisation of the national gas transmission network norther semi-ring with the construction of
383 km looping with a diameter of Dn 700 from CS Valchi dol to line valve Novi Iskar. The realization of the project will ensure new exit capacity of 4
bcm/y (128,3 GWh/d) in the direction to Romania (through IBR) and Chiren UGS (for transmission during injection and withdrawal amounting to 500
mcm/y). In the context of the European objectives to build an interconnected and single pan-European marker, the realization of the presented
projects, forming the gas hub concept, is in line with the projects for the development of the Southern gas corridor and in full compliance with the
plans for development of gas infrastructure in Europe to enhance the security of supply and the diversification of natural gas supply sources.
Regulatory Decisions and
similar material conditions
Enabled Projects
Project Code Project Name
UGS-N-138 UGS Chiren Expansion
TRA-F-057 Interconnection Bulgaria²Romania
TRA-N-593 Varna-Oryahovo gas pipeline
TRA-N-594 Construction of a Looping CS Provadia ² Rupcha village
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 38 of 620
Current TYNDP : TYNDP 2017 - Annex A