Benefits
Main Driver
Regulation SoS
PCI Details
PCI Benefits
Project concerns investment in reverse flow capacity
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Security of Supply
Specific Criteria Fulfilled Comments
The project appears necessary considering that the stress test on the existing pipeline system have proved critical issues in case of emergency
or peak demand in an area where gas flows from the south and from the north merges at a relatively low pressure regime.
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Cellino-San Marco
15 km completed, 75 km under construction
500
90
Chieti-Cellino
already completed and running
500
55
Larino - Chieti
600
110
San Marco-Recanati
Construction 3 MW compression station SAN MARCO
600
32
3
Total
287
3
Schedule
Start Date
End Date
Pre-Feasibility
12/2013
Feasibility
01/2014
12/2014
FEED
01/2015
01/2015
Market Test
06/2012
Permitting
01/2015
12/2019
Supply Contracts
06/2019
FID
12/2016
Construction
06/2018
12/2022
Commissioning
2022
2022
NDP and PCI Information
Part of NDP
Yes (There is no NDP currently in force)
NDP Number
Not applicable
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 382 of 620
Current TYNDP : TYNDP 2017 - Annex A