PCI Details

PCI Benefits

Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Security of Supply

Specific Criteria Fulfilled Comments

The project appears necessary considering that the stress test on the existing pipeline system have proved critical issues in case of emergency

or peak demand in an area where gas flows from the south and from the north merges at a relatively low pressure regime.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Cellino-San Marco

15 km completed, 75 km under construction

500

90

Chieti-Cellino

already completed and running

500

55

Larino - Chieti

600

110

San Marco-Recanati

Construction 3 MW compression station SAN MARCO

600

32

3

Total

287

3

Schedule

Start Date

End Date

Pre-Feasibility

12/2013

Feasibility

01/2014

12/2014

FEED

01/2015

01/2015

Market Test

06/2012

Permitting

01/2015

12/2019

Supply Contracts

06/2019

FID

12/2016

Construction

06/2018

12/2022

Commissioning

2022

2022

NDP and PCI Information

Part of NDP

Yes (There is no NDP currently in force)

NDP Number

Not applicable

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM