Expected Gas Sourcing

LNG ()

Benefits

Main Driver

Market Demand

Main Driver Explanation

Sardinia, located off the West coast of Italy, has ca. 1.7mn inhabitants and is currently the only region in Italy that does not have a proper gas

infrastructure Sassari, Nuoro, Oristano and Cagliari have already a developed local distribution network, supplied by aired LPG; local distribution

companies are developing a network covering ca. 40% of the population. Additional investments would significantly improve gas penetration in the island.

MSE, the Sardinia region and AEEGSI are assessing possible solutions to Sardinia·s gas supply via LNG

Benefit Description

Converting coal and oil fired power stations to gas will lead to a substantial reduction of CO2 emissions. A single Sardinia price for gas - enabled by a

region wide gaas Network - will also bring a relevant cost reduction for Sardinia citizens and industries, whose energy prices can be as high as twice Italian

average.

PCI Details

PCI Benefits

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Sustainability

Specific Criteria Fulfilled Comments

This Project will halt Sardinia industrial decline driven - also - by higher than average energy cost. The high energy cost is a barrier to the

development of new competitive productive activities. Current generation capacity is coal/fuel oil based. Gas substition is an upside which will

bring environmental benefits. An integrated onshoregas + Small Scale LNG development will be the catalist for developing LNG bunkering

leveraging on Sardinia ferry connections and its position at the centre of the Med.

Barriers

Barrier Type

Description

Regulatory

NRA to clarify: 1) that Tariff Regime applicable in mainland Italy is also applicable on Sardinia gas network development, irrespective of its physical

connection with Italy's Network; 2) Tariff and TPA Regime for SSLNG (this only indirectly relevant to onshore network)

Others

Time-table of the project can be affected by the effective realization of LNG Terminals

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 385 of 620

Current TYNDP : TYNDP 2017 - Annex A