Gas Interconnection Poland-Lithuania (GIPL) (Lithuania's section)
General Information
Promoter
AB Amber Grid
Operator
AB Amber Grid
Host Country
Lithuania
Status
Planned
Website
Project's URLPublication Approval Status
Approved
Sponsors
AB Amber Grid
100%
TRA-N-341
Project
Pipeline including CS
Non-FID
Update Date
06/05/2016
Advanced
Description
The project is aimed to establish a well-functioning new bidirectional interconnection between the Polish and Lithuanian gas transmission systems to
integrate the isolated gas markets of the Baltic States into the EU gas grid, by introducing an alternative gas supply route to the Baltic States. By
implementing the project a 165 km-long and 700 mm-diameter pipeline and gas pressure reduction and metering station will be constructed on
Lithuania's side.
Regulatory Decisions and
similar material conditions
On 11 August 2014 ACER adopted a decision No 01/2014 On The Investment Request including Cross-Border Cost Allocation for The Gas
Interconncetion Poland-Lithuania Project of Common Interest No. 8.5.
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Interconnector PL-LT
AB Amber Grid
2019
LT
PL
51.1 GWh/d
AB Amber Grid
2019
PL
LT
73.9 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM