Benefits
Main Driver
Market Demand
Main Driver Explanation
Benefit Description
Increased flexibility of the system; Market integration (increase of competition and market liquidity).
Technical Information (UGS)
Storage Facility
Bordolano
Storage Facility Type
Depleted Field
Multiple-Cycle
No
Working Volume (mcm)
757.00
the entire w.g. volume of Bordolano (first + second phases) is 1.136 M Nmc
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
Market Test
Permitting
Supply Contracts
FID
Construction
Commissioning
2019
2019
NDP and PCI Information
Part of NDP
Yes (Snam Rete Gas TYNDP 2016-2025)
NDP Number
NA
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%