Connection of Malta to the European Gas Network - LNG Regasification

General Information

Promoter

Office of the Prime Minister

(Energy)

Operator

Office of the Prime Minister

(Energy) ² Malta

Host Country

Malta

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

LNG-N-211

Project

LNG Terminal

Non-FID

Update Date

22/06/2016

Non-Advanced

Description

This project addresses the 'LNG Regasification Infrastructure' component of PCI 5.19 'Malta Connection' and reflects the results from the pre-

feasibility study concluded in April 2015 which identified the Malta-Italy gas pipeline interconnection (TRA-N-031) as the first phase of the PCI which

will end Malta's isolation from the Trans European gas network. Following completion of this first phase and subject to further in-depth analysis and

market development; a second future phase consisting of a Floating Storage and Regasification Unit berthed approximately 12km offshore from

Malta together with an associated pipeline infrastructure to Delimara (Malta) is being planned. This project, besides meeting Malta ·s natural gas

requirements, shall provide for the possibility of exporting natural gas to the European Natural Gas network through the gas interconnector which

will enable it to operate in bi-directional flow mode. TRA-N-031 and LNG-N-211 are complementary projects.

Regulatory Decisions and

similar material conditions

N/A

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Malta FSRU Offshore Terminal

Office of the Prime Minister (Energy) ²

Malta

2031

LNG_Tk_MT

MT

56.0 GWh/d

Comment: Amended to reflect send-out capacity from FSRU Offshore Terminal to Delimara

(Malta)

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 410 of 620

Current TYNDP : TYNDP 2017 - Annex A