Connection of Malta to the European Gas Network - LNG Regasification
General Information
Promoter
Office of the Prime Minister
(Energy)
Operator
Office of the Prime Minister
(Energy) ² Malta
Host Country
Malta
Status
Planned
Website
Project's URLPublication Approval Status
Approved
Sponsors
LNG-N-211
Project
LNG Terminal
Non-FID
Update Date
22/06/2016
Non-Advanced
Description
This project addresses the 'LNG Regasification Infrastructure' component of PCI 5.19 'Malta Connection' and reflects the results from the pre-
feasibility study concluded in April 2015 which identified the Malta-Italy gas pipeline interconnection (TRA-N-031) as the first phase of the PCI which
will end Malta's isolation from the Trans European gas network. Following completion of this first phase and subject to further in-depth analysis and
market development; a second future phase consisting of a Floating Storage and Regasification Unit berthed approximately 12km offshore from
Malta together with an associated pipeline infrastructure to Delimara (Malta) is being planned. This project, besides meeting Malta ·s natural gas
requirements, shall provide for the possibility of exporting natural gas to the European Natural Gas network through the gas interconnector which
will enable it to operate in bi-directional flow mode. TRA-N-031 and LNG-N-211 are complementary projects.
Regulatory Decisions and
similar material conditions
N/A
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Malta FSRU Offshore Terminal
Office of the Prime Minister (Energy) ²
Malta
2031
LNG_Tk_MT
MT
56.0 GWh/d
Comment: Amended to reflect send-out capacity from FSRU Offshore Terminal to Delimara
(Malta)
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM