Technical Information (LNG)

LNG Facility

Malta FSRU Offshore

Terminal

Expected Volume (bcm/y)

2

No change from TYNDP 2015

Storage Capacity (m3)

180,000

No change from TYNDP 2015

Ship Size (m3)

135,000

No change from TYNDP 2015

Reloading Ability

Yes

PCI Details

PCI Benefits

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at

supplying directly or indirectly at least two Member States

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

The overall PCI will end Malta's isolation from the Trans-European gas network and thus contribute to gas market integration, improved

security of energy supply and more diversified sources, routes, suppliers of energy for the island and improved competitiveness and

affordability. It is expected to support objectives of sustainability as it will contribute towards the reduction of GHG emissions. The ¶LNG

infrastructure· component besides meeting Malta·s natural gas requirements including future demand for maritime LNG bunkering; shall also

achieve the gas N-1 infrastructure requirement as there would be two sources of natural gas supply to Malta and provide for the possibility to

export gas to Italy/Europe. The LNG component will also complement the provisions of Directive 2014/94/EU and the Energy Union strategy in

fuel of an added entry point of natural gas to the EU i.e. effectively contributing towards the diversification of sources, routes and suppliers of

gas to the EU.

Schedule

Start Date

End Date

Pre-Feasibility

01/2019

Feasibility

01/2019

01/2025

FEED

01/2026

01/2028

Market Test

01/2027

Permitting

01/2025

01/2028

Supply Contracts

01/2028

FID

01/2028

Construction

01/2029

01/2031

Commissioning

2031

2031

NDP and PCI Information

Part of NDP

Yes (Malta National Reform Programme

April 2015 )

NDP Number

Section 3.4.2

Currently PCI

Yes (5.19)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 411 of 620

Current TYNDP : TYNDP 2017 - Annex A