Expected Gas Sourcing

LNG ()

Benefits

Main Driver

Regulation SoS

Main Driver Explanation

The main project driver for this component of the PCI is the Gas Security of Supply EU Regulation No. 994/2010. This second phase of the PCI will achieve

the N-1 infrastructure requirement and contribute to the overall system flexibility and interoperability. The infrastructure will be capable to offer capacity

for bi-directional flow through the gas pipeline interconnector.

Benefit Description

The ¶LNG infrastructure· (i.e. LNG-N-211) component besides meeting Malta·s gas requirements, including future demand for maritime LNG bunkering (i.e.

complementing provisions of Directive 2014/94EU on the deployment of alternative fuels infrastructure); it shall also achieve Malta·s N-1 infrastructure

requirement for gas as there would be two sources of gas supply to Malta. Since this project also provides for the possibility of export of gas to the Trans

European gas network, Europe and Italy in particular; the project would effectively mean a new entry point of natural gas within the EU. This would

complement the Energy Union·s strategy towards the diversification of sources, routes and suppliers of natural gas.

Time Schedule

Grant Obtention Date

25/11/2013

Delay Since Last TYNDP

Yes

Delay Explanation

Since the last TYNDP, a pre-feasibility study of the PCI was completed in April 2015. The re-scheduling above for the gas pipeline

interconnector component of the PCI reflects conclusions from this study which identified the gas pipeline interconnection (TRA-N-031)

between Sicily and Malta as Phase 1 for the PCI implementation; whilst the possibility of exporting gas to Italy sourced from an FSRU located

approx. 12km offshore from Malta (i.e. LNG-N-211) is to be considered as Phase 2 of PCI 5.19.

Barriers

Barrier Type

Description

Market

Lack of market maturity

Market

Lack of market support