PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Enabled Projects

Project Code Project Name

LNG-N-211 Connection of Malta to the European Gas Network - LNG Regasification

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Delimara (Malta) to Gela (Sicily) Italy

Length & diameter of interconnector have been updated

following results from pre-feasibility study completed in April

2015.

560

155

FSRU (Malta) to Delimara (Malta)

Diameter updated to reflect send-out capacity of offshore

FSRU.

560

12

Total

167

Schedule

Start Date

End Date

Pre-Feasibility

04/2015

Feasibility

04/2013

04/2015

FEED

08/2019

06/2020

Market Test

04/2019

Permitting

04/2017

06/2020

Supply Contracts

10/2021

FID

06/2020

Construction

05/2023

11/2025

Commissioning

2026

2026

NDP and PCI Information

Part of NDP

Yes (Malta National Reform Programme

April 2015 )

NDP Number

Section 3.4.2

Currently PCI

Yes (5.19)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 408 of 620

Current TYNDP : TYNDP 2017 - Annex A