Table of Contents Table of Contents
Previous Page  906-907 / 1248 Next Page
Information
Show Menu
Previous Page 906-907 / 1248 Next Page
Page Background

FSRU Polish Baltic Sea Coast

General Information

Promoter

GAZ-SYSTEM S.A.

Operator

GAZ-SYSTEM S.A.

Host Country

Poland

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

LNG-N-947

Project

LNG Terminal

Non-FID

Update Date

07/06/2016

Non-Advanced

Description

The FSRU Polish Baltic Sea Coast project is planned as the first floating terminal in Poland . It will come on stream in 2020 with annual re-gasification

capacity of 4.5-9 bcm/y. The FSRU terminal will consist of one/two storage tank(s) with the capacity of 170 tcm. The project will offer its

regasification capacities to gas consumers in Poland and other countries in the Baltic Sea region (supplies to be directed via Gas Interconnection

Poland-Lithuania and/or LNG ships) and in Central-Eastern Europe (supplies within the North-South Gas Corridor via PL-CZ, PL-SK and PL-UA

interconnections). The scope of the project is currently under assessment.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

FSRU Polish Baltic Sea Coast

GAZ-SYSTEM S.A.

2020

LNG_Tk_PL

PL

275.0 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 450 of 620

Current TYNDP : TYNDP 2017 - Annex A