General Information
Promoter
GAZ-SYSTEM S.A.
Operator
GAZ-SYSTEM S.A.
Host Country
Poland
Status
Planned
Website
Publication Approval Status
Approved
Sponsors
LNG-N-947
Project
LNG Terminal
Non-FID
Update Date
07/06/2016
Non-Advanced
Description
The FSRU Polish Baltic Sea Coast project is planned as the first floating terminal in Poland . It will come on stream in 2020 with annual re-gasification
capacity of 4.5-9 bcm/y. The FSRU terminal will consist of one/two storage tank(s) with the capacity of 170 tcm. The project will offer its
regasification capacities to gas consumers in Poland and other countries in the Baltic Sea region (supplies to be directed via Gas Interconnection
Poland-Lithuania and/or LNG ships) and in Central-Eastern Europe (supplies within the North-South Gas Corridor via PL-CZ, PL-SK and PL-UA
interconnections). The scope of the project is currently under assessment.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
FSRU Polish Baltic Sea Coast
GAZ-SYSTEM S.A.
2020
LNG_Tk_PL
PL
275.0 GWh/d