3rd IP between Portugal and Spain (Compressor Station)

General Information

Promoter

REN-Gasodutos, S.A.

Operator

REN - Gasodutos, S.A.

Host Country

Portugal

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

REN Gasodutos

100%

TRA-N-284

Project

Pipeline including CS

Non-FID

Update Date

24/05/2016

Non-Advanced

Description

The 3RD Interconnection Point (IP) PORTUGAL-SPAIN is located in the priority corridor North-South in Western Europe, and involves Portugal and

Spain by crossing the border between both Member States. This project will contain a compressor station in the already existing pipeline

Cantanhede-Mangualde. This project enables the project TRA-N-285 3rd IP between Portugal and Spain Spain (pipeline Cantanhede-Mangualde).

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

TRA-N-285 3rd IP between Portugal and Spain (pipeline Cantanhede-Mangualde)

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

VIP IBERICO

REN - Gasodutos, S.A.

2025

PT

ES

27.0 GWh/d

Comment: econd Step. of the 3RD Interconnection Point (IP) between Portugal and SP.

REN - Gasodutos, S.A.

2025

ES

PT

22.0 GWh/d

Comment: Second Step. of the 3RD Interconnection Point (IP) between Portugal and SP.