Time Schedule
Grant Obtention Date
PCI Details
PCI Benefits
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation
prior to the commissioning of the project, Project concerns investment in reverse flow capacity
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
The project increases the security of supply in the Portuguese gas system and guarantees the fulfilment of the N-1 criterion of the Regulation
1
,W IDFLOLWDWHV WKH LQWHJUDWLRQ RI WKH 3RUWXJXHVH PDUNHW DW ,EHULDQ DQG (XURSHDQ OHYHO LPSURYLQJ FRPSHWLWLRQ DQG SURYLGLQJ
shippers with access to alternative balancing gas enhancing transmission fluidity. It also contributes to the European gas sources
diversification, as pointed out in the EC COM (2904)330 European Energy Security Strategy. At the moment, Portuguese NG system has lower
diversification indexes measured both on capacity and on supply sources, than most of the European countries. The assessment carried out by
the Commission on the selection process for the second List of PCI, identified a high and balanced contribution of the project, between the
FULWHULRQV RI WKH 5HJXODWLRQ Q
PDUNHW LQWHJUDWLRQ VHFXULW\ RI VXSSO\ DQG FRPSHWLWLRQ
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Pipeline Cantanhede-Mangualde
Third Step of the 3RD Interconnection Point between Portugal
and Spain.
500
67
Total
67
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
Market Test
Permitting
Supply Contracts
FID
12/2022
Construction
01/2023
12/2025
Commissioning
2025
2025
NDP and PCI Information
Part of NDP
Yes (PDIRGN 2015)
NDP Number
-
Currently PCI
Yes (5.4)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM