3rd IP between Portugal and Spain (pipeline Cantanhede-Mangualde)
General Information
Promoter
REN-Gasodutos, S.A.
Operator
REN - Gasodutos, S.A.
Host Country
Portugal
Status
Planned
Website
Project's URLPublication Approval Status
Approved
Sponsors
REN Gasodutos
100%
TRA-N-285
Project
Pipeline including CS
Non-FID
Update Date
23/05/2016
Non-Advanced
Description
TThe 3RD Interconnection Point (IP) PORTUGAL-SPAIN is located in the priority corridor North-South in Western Europe, and involves Portugal and
Spain by crossing the border between both Member States. This project corresponds to a second pipeline parallel to the already existing pipeline
between Cantanhede and Mangualde.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
VIP IBERICO
REN - Gasodutos, S.A.
2025
PT
ES
29.0 GWh/d
Comment: Third Step of the 3RD Interconnection Point between Portugal and Spain.
REN - Gasodutos, S.A.
2025
ES
PT
32.0 GWh/d
Comment: Third Step of the 3RD Interconnection Point between Portugal and Spain.