Immingham Storage Co Ltd – Immingham East Terminal - No4 Switchroom Tank Overfill Safety Instrument System

Logic Panel Factory Acceptance Test Procedure

P & I Design Ltd

DOCUMENT NO: SI483005_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 05.03.13

Tel: + 44 (0)1642 617444

PAGE 19 OF 19

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

7.0

HANDOVER AND LIFE CYCLE

Equipment Required

None specific.

Purpose of Test

Return logic panel to working condition as found prior to testing.

Update documentation and confirm testing complete to move on to next phase of proof testing.

Method Of Test

7.0.1

Remove all test links and test equipment.

7.0.2

Replace all removable links as found.

7.0.3

Replace incoming and outgoing terminals as found.

7.0.4

Replace or secure covers and guards.

7.0.5

Complete handover and deviation list.

7.0.6

Update documentation as required.

Result

1.

All test links removed.

2.

All removable links as found.

3.

All incoming and outgoing terminals returned to as found.

4.

All covers and guards replaced or secured inside panel.

5.

Handover and deviation list completed.

6.

Documentation update as required.

Actions/Comments

Sign

Date

Tested by