Immingham Storage Co Ltd – Immingham East Terminal - No4 Switchroom Tank Overfill Safety Instrument System
Logic Panel Factory Acceptance Test Procedure
P & I Design Ltd
DOCUMENT NO: SI483005_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: A DATE: 05.03.13
Tel: + 44 (0)1642 617444
PAGE 14 OF 19
Fax: + 44 (0)1642 616447
www.pidesign.co.uk4.2.6 BPCS VALVE COMMANDS
Equipment Required
Multi-meter, hand tools, links, yellow highlighter, red pen, 24Vdc Supply.
Purpose of Test
To verify the functionality of BPCS valve command logic.
To verify the functionality of an open circuit failure.
Method Of Test
4.2.6.1
Connect a 24Vdc supply to incoming terminals. Confirm BPCS valve
command relay energised when 24Vdc supply on and relay de-energised when
24Vdc supply off.
Result
1.
Tank 561 XV56101 R306.
2.
Tank 564 XV56401 R386.
3.
Tank 568 XV56801 R466.
Actions/Comments
Sign
Date
Tested by