Trenching Production

(get loose volume from scale E and enter on this page

scale E)

5) Enter required linear production rate 9 m/h (30 t/hr)

on scale G.

6) Connect E and G. Transfer hourly production rate

from scale F to scale K (next page).

7) Estimate cycle time (23 sec) based on anticipated

conditions and enter on scale H.

8) Estimate hourly digging time (27 min) and enter on

scale I.

9) Connect H through I to scale J for cycles per hour.

E

LOOSE

VOLUME

LCM/m

LCY/ft

F

HOURLY

PRODUCTION

LCM/m

LCY/ft

G

LINEAR

PRODUCTION

m/h

ft/hr

H

CYCLETIME

100’s

of min

Sec

I

DIGGING

TIME/HR.

J

CYCLES

PER

HOUR

% of

Hour

%

Digging

time/hr

min

Cycles/hr