Trenching Production

(get cycles per hour from scale J and enter on this page

scale J)

10) Connect J through K to scale L for required vol-

ume per cycle.

11) Enter estimated bucket fill factor (100%) on scale M.

12) Connect L through M to scale N for required bucket

size.

NOTE:

Ensure bucket width does not exceed minimum

trench width and also that weight of bucket and

payload does not exceed machine working weight

capacity (see lift capacity charts in this section).