Page Background

Hydraulic

Excavators

7

Edition 47 7-261

Trenching Production

Excavation Volumes

Metric version

Bank m

3

/meter = (Trench end area m

2

)

×

(one m)

Trench volume (Bm

3

/m) =

1

/

2

(A + C)

×

B

Spoil pile volume (Lm

3

/m) = (Bm

3

/m)

×

(1.00 + % Swell)

English version

Bank yd

3

/foot =

(Trench end area ft

2

)

×

(one ft)

___________________________

27

Trench volume (BCY/ft) =

1

/

2

(A + C)

×

B

_____________

27

Spoil pile volume (LCY/ft) = (BCY/ft)

×

(1.00 + % Swell)

The following table provides a general guide to trench

bottom width for various outside diameters of pipe.

Swing

Angle

Angle of

Repose

H = max. reach at

spoil pile ht.

Side Slope

Trench

Spoil Pile

ExcavationVolumes Per Meter or Foot of Trench Length

Pipe Diameter TrenchWidth Pipe Diameter TrenchWidth

mm ft/in m ft/in mm ft/in m ft/in

102

4"

0.49

1'7"

1524

5'0"

2.59

8'6"

152

6"

0.55

1'10"

1676

5'6"

2.80

9'2"

203

8"

0.61

2'0"

1829

6'0"

3.05

10'0"

254

10"

0.70

2'4"

1981

6'6"

3.26

10'8"

305

12"

0.76

2'6"

2134

7'0"

3.47

11'5"

381

15"

0.91

3'0"

2286

7'6"

3.69

12'1"

457

18"

1.03

3'5"

2438

8'0"

3.93

12'11"

533

1'9"

1.16

3'10"

2591

8'6"

4.15

13'7"

610

2'0"

1.25

4'1"

2743

9'0"

4.36

14'4"

686

2'3"

1.37

4'6"

2896

9'6"

4.54

14'11"

838

2'9"

1.58

5'2"

3048

10'0"

4.75

15'7"

914

3'0"

1.70

5'7"

3200

10'6"

4.99

16'5"

1067

3'6"

1.92

6'4"

3353

11'0"

5.21

17'1"

1219

4'0"

2.13

7'0"

3505

11'6"

5.43

17'10"

1372

4'6"

2.38

7'10"

3658

16'2"

5.64

18'6"

NOTE:

Trench widths based on 1.25 Bc + 1.0 where Bc is the outside diameter

of the pipe in feet.

Table courtesy of American Concrete Pipe Association