Lifting Capacities

MH3024

(Grenoble Sourced)

Lift Capacities

All values are in lb, bucket cylinder and linkage installed, hydraulic cab riser, work tool: none, with counterweight (9040 lb), heavy lift on.

Load point height

Load over front

Load over rear

Load over side

Load at maximum reach (sticknose/bucket pin)

Undercarriage

Boom

Stick

MH or Standard

One-Piece

8'2"

Undercarriage configuration

10 ft

15 ft

20 ft

25 ft

ft

25 ft

MH – stabilizers up – solid tires

*8400

*8400

*8400

19.36

MH – stabilizers down – solid tires

*8400

*8400

*8400

Lower (std UC) – f. stabilizer & r. dozer up

*8400

*8400

*8400

Lower (std UC) – f. stabilizer & r. dozer down

*8400

*8400

*8400

Lower (std UC) – f. dozer & r. stabilizer up

*8400

*8400

*8400

Lower (std UC) – f. dozer & r. stabilizer down

*8400

*8400

*8400

Lower (std UC) – 2 sets stabilizersup

*8400

*8400

*8400

Lower (std UC) – 2 sets stabilizersdown

*8400

*8400

*8400

20 ft

MH – stabilizers up – solid tires

12,800 12,800

9600

*7400

*7400

7300

23.46

MH – stabilizers down – solid tires

*14,100 *14,100 *14,100

*7400

*7400

*7400

Lower (std UC) – f. stabilizer & r. dozer up

12,500 11,900

9200

*7400

*7400

6900

Lower (std UC) – f. stabilizer & r. dozer down

*14,100 *14,100 14,000

*7400

*7400

*7400

Lower (std UC) – f. dozer & r. stabilizer up

13,000 11,500

9200

*7400

*7400

6900

Lower (std UC) – f. dozer & r. stabilizer down

*14,100 *14,100 *14,100

*7400

*7400

*7400

Lower (std UC) – 2 sets stabilizersup

12,900 11,800

9300

*7400

*7400

7000

Lower (std UC) – 2 sets stabilizersdown

*14,100 *14,100 *14,100

*7400

*7400

*7400

15 ft

MH – stabilizers up – solid tires

12,500 12,500

9300

8700

8700

6500

*7100

*7100

6000

25.92

MH – stabilizers down – solid tires

*15,100 *15,100 *15,100 *12,100 *12,100 *12,100

*7100

*7100

*7100

Lower (std UC) – f. stabilizer & r. dozer up

12,200 11,600

8800

8500

8100

6100

*7100

*7100

5700

Lower (std UC) – f. stabilizer & r. dozer down

*15,100 *15,100 13,700 *12,100 *12,100

9500

*7100

*7100

*7100

Lower (std UC) – f. dozer & r. stabilizer up

12,600 11,100

8800

8800

7800

6100

*7100

*7100

5700

Lower (std UC) – f. dozer & r. stabilizer down

*15,100 *15,100 14,100 *12,100 *12,100

9800

*7100

*7100

*7100

Lower (std UC) – 2 sets stabilizersup

12,500 11,500

8900

8700

8000

6200

*7100

*7100

5800

Lower (std UC) – 2 sets stabilizersdown

*15,100 *15,100 *15,100 *12,100 *12,100 11,700

*7100

*7100

*7100

10 ft

MH – stabilizers up – solid tires

18,200 18,200 13,100 11,900 11,900

8800

8500

8500

6300

*7100

*7100

5400

27.23

MH – stabilizers down – solid tires

*22,400 *22,400 *22,400 *16,700 *16,700 *16,700 *14,000 *14,000 13,700

*7100

*7100

*7100

Lower (std UC) – f. stabilizer & r. dozer up

18,000 16,700 12,500 11,600 11,000

8300

8300

7900

5900

*7100

6900

5100

Lower (std UC) – f. stabilizer & r. dozer down

*22,400 *22,400 20,300 *16,700 *16,700 13,100 *14,000 *14,000

9300

*7100

*7100

*7100

Lower (std UC) – f. dozer & r. stabilizer up

18,600 16,200 12,500 12,100 10,600

8300

8600

7600

5900

*7100

6600

5100

Lower (std UC) – f. dozer & r. stabilizer down

*22,400 *22,400 21,000 *16,700 *16,700 13,500 *14,000 13,800

9600

*7100

*7100

*7100

Lower (std UC) – 2 sets stabilizersup

18,500 16,700 12,600 12,000 11,000

8400

8500

7800

6000

*7100

6800

5200

Lower (std UC) – 2 sets stabilizersdown

*22,400 *22,400 *22,400 *16,700 *16,700 16,200 *14,000 *14,000 11,400

*7100

*7100

*7100

5 ft

MH – stabilizers up – solid tires

17,100 17,100 12,100 11,400 11,400

8300

8300

8300

6000

7200

7200

5200

27.53

MH – stabilizers down – solid tires

*25,400 *25,400 *25,400 *18,200 *18,200 *18,200 *14,500 *14,500 13,400

*7400

*7400

*7400

Lower (std UC) – f. stabilizer & r. dozer up

16,800 15,700 11,500 11,100 10,500

7800

8000

7600

5700

7000

6600

4900

Lower (std UC) – f. stabilizer & r. dozer down

*25,400 *25,400 19,200 *18,200 *18,200 12,600 *14,500 *14,500

9100

*7400

*7400

*7400

Lower (std UC) – f. dozer & r. stabilizer up

17,400 15,100 11,500 11,500 10,100

7800

8400

7300

5700

7200

6400

4900

Lower (std UC) – f. dozer & r. stabilizer down

*25,400 *25,400 19,900 *18,200 *18,200 12,900 *14,500 13,600

9300

*7400

*7400

*7400

Lower (std UC) – 2 sets stabilizersup

17,300 15,600 11,600 11,400 10,400

7900

8300

7600

5800

7200

6600

5000

Lower (std UC) – 2 sets stabilizersdown

*25,400 *25,400 24,500 *18,200 *18,200 15,600 *14,500 14,000 11,200

*7400

*7400

*7400

0 ft

MH – stabilizers up – solid tires

16,600 16,600 11,600 11,000 11,000

7900

8100

8100

5900

7400

7400

5300

26.84

MH – stabilizers down – solid tires

*25,700 *25,700 *25,700 *18,700 *18,700 18,500 *14,400 *14,400 13,200

*8100

*8100

*8100

Lower (std UC) – f. stabilizer & r. dozer up

16,300 15,200 11,000 10,700 10,100

7500

7900

7500

5500

7100

6800

5000

Lower (std UC) – f. stabilizer & r. dozer down

*25,700 *25,700 18,600 *18,700 *18,700 12,200 *14,400 *14,400

8900

*8100

*8100

8100

Lower (std UC) – f. dozer & r. stabilizer up

16,900 14,600 11,000 11,200

9700

7500

8200

7200

5500

7400

6500

5000

Lower (std UC) – f. dozer & r. stabilizer down

*25,700 *25,700 19,300 *18,700 *18,700 12,600 *14,400 13,400

9100

*8100

*8100

*8100

Lower (std UC) – 2 sets stabilizersup

16,800 15,100 11,200 11,100 10,100

7600

8100

7400

5600

7400

6700

5100

Lower (std UC) – 2 sets stabilizersdown

*25,700 *25,700 24,000 *18,700 *18,700 15,200 *14,400 13,800 11,000

*8100

*8100

*8100

–5 ft

MH – stabilizers up – solid tires

*22,200 *22,200 21,500 16,500 16,500 11,600 10,900 10,900

7800

8100

8100

5900

8000

8000

5800

25.13

MH – stabilizers down – solid tires

*22,200 *22,200 *22,200 *23,800 *23,800 *23,800 *17,700 *17,700 *17,700 *11,300 *11,300 *11,300

*9500

*9500

*9500

Lower (std UC) – f. stabilizer & r. dozer up

*22,200 *22,200 20,400 16,200 15,100 11,000 10,600 10,000

7400

7800

7500

5500

7800

7400

5500

Lower (std UC) – f. stabilizer & r. dozer down

*22,200 *22,200 *22,200 *23,800 *23,800 18,600 *17,700 *17,700 12,100 *11,300 *11,300

8900

*9500

*9500

8800

Lower (std UC) – f. dozer & r. stabilizer up

*22,200 *22,200 20,400 16,900 14,500 11,000 11,000

9600

7400

8200

7100

5500

8100

7100

5500

Lower (std UC) – f. dozer & r. stabilizer down

*22,200 *22,200 *22,200 *23,800 *23,800 19,200 *17,700 *17,700 12,400 *11,300 *11,300

9100

*9500

*9500

9100

Lower (std UC) – 2 sets stabilizersup

*22,200 *22,200 20,700 16,700 15,000 11,100 11,000 10,000

7500

8100

7400

5600

8000

7400

5600

Lower (std UC) – 2 sets stabilizersdown

*22,200 *22,200 *22,200 *23,800 *23,800 *23,800 *17,700 *17,700 15,100 *11,300 *11,300 11,000

*9500

*9500

*9500

–10 ft

MH – stabilizers up – solid tires

*25,700 *25,700 21,900 16,700 16,700 11,800 11,000 11,000

7900

9700

9700

7000

22.15

MH – stabilizers down – solid tires

*25,700 *25,700 *25,700 *19,800 *19,800 *19,800 *14,500 *14,500 *14,500

*11,800 *11,800 *11,800

Lower (std UC) – f. stabilizer & r. dozer up

*25,700 *25,700 20,800 16,400 15,300 11,100 10,800 10,200

7500

9400

8900

6700

Lower (std UC) – f. stabilizer & r. dozer down

*25,700 *25,700 *25,700 *19,800 *19,800 18,800 *14,500 *14,500 12,200

*11,800 *11,800 10,700

Lower (std UC) – f. dozer & r. stabilizer up

*25,700 *25,700 20,800 17,100 14,700 11,100 11,200

9800

7500

9800

8600

6700

Lower (std UC) – f. dozer & r. stabilizer down

*25,700 *25,700 *25,700 *19,800 *19,800 19,400 *14,500 *14,500 12,600

*11,800 *11,800 11,000

Lower (std UC) – 2 sets stabilizersup

*25,700 *25,700 21,100 16,900 15,200 11,300 11,100 10,100

7600

9700

8900

6700

Lower (std UC) – 2 sets stabilizersdown

*25,700 *25,700 *25,700 *19,800 *19,800 *19,800 *14,500 *14,500 *14,500

*11,800 *11,800 *11,800

*Limited by hydraulic rather than tipping load.

Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating

axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface. For lifting capacity including bucket and/or quick coupler, the respective weight has to be subtracted from

above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance.

Always refer to the appropriate Operation and Maintenance Manual for specific product information.