Edition 47 9-53

Material Handlers

9

Lifting Capacities

MH3024

(Grenoble Sourced)

Lift Capacities

All values are in lb, bucket cylinder and linkage installed, hydraulic cab riser, work tool: none, with counterweight (9040 lb), heavy lift on.

Load point height

Load over front

Load over rear

Load over side

Load at maximum reach (sticknose/bucket pin)

Undercarriage

Boom

Stick

MH or Standard

One-Piece

9'6"

Undercarriage configuration

10 ft

15 ft

20 ft

25 ft

ft

25 ft

MH – stabilizers up – solid tires

*6900

*6900

*6900

21.13

MH – stabilizers down – solid tires

*6900

*6900

*6900

Lower (std UC) – f. stabilizer & r. dozer up

*6900

*6900

*6900

Lower (std UC) – f. stabilizer & r. dozer down

*6900

*6900

*6900

Lower (std UC) – f. dozer & r. stabilizer up

*6900

*6900

*6900

Lower (std UC) – f. dozer & r. stabilizer down

*6900

*6900

*6900

Lower (std UC) – 2 sets stabilizersup

*6900

*6900

*6900

Lower (std UC) – 2 sets stabilizersdown

*6900

*6900

*6900

20 ft

MH – stabilizers up – solid tires

*6100

*6100

*6100

24.93

MH – stabilizers down – solid tires

*6100

*6100

*6100

Lower (std UC) – f. stabilizer & r. dozer up

*6100

*6100

*6100

Lower (std UC) – f. stabilizer & r. dozer down

*6100

*6100

*6100

Lower (std UC) – f. dozer & r. stabilizer up

*6100

*6100

*6100

Lower (std UC) – f. dozer & r. stabilizer down

*6100

*6100

*6100

Lower (std UC) – 2 sets stabilizersup

*6100

*6100

*6100

Lower (std UC) – 2 sets stabilizersdown

*6100

*6100

*6100

15 ft

MH – stabilizers up – solid tires

12,500 12,500

9300

8800

8800

6500

*5900

*5900

5500

27.26

MH – stabilizers down – solid tires

*14,300 *14,300 *14,300 *12,800 *12,800 *12,800

*5900

*5900

*5900

Lower (std UC) – f. stabilizer & r. dozer up

12,300 11,600

8900

8500

8100

6200

*5900

*5900

5200

Lower (std UC) – f. stabilizer & r. dozer down

*14,300 *14,300 13,800 *12,800 *12,800

9600

*5900

*5900

*5900

Lower (std UC) – f. dozer & r. stabilizer up

12,700 11,200

8900

8900

7800

6200

*5900

*5900

5200

Lower (std UC) – f. dozer & r. stabilizer down

*14,300 *14,300 14,200 *12,800 *12,800

9800

*5900

*5900

*5900

Lower (std UC) – 2 sets stabilizersup

12,600 11,600

9000

8800

8100

6200

*5900

*5900

5300

Lower (std UC) – 2 sets stabilizersdown

*14,300 *14,300 *14,300 *12,800 *12,800 11,700

*5900

*5900

*5900

10 ft

MH – stabilizers up – solid tires

18,400 18,400 13,300 12,000 12,000

8800

8500

8500

6300

*5900

*5900

5000

28.51

MH – stabilizers down – solid tires

*21,200 *21,200 *21,200 *16,000 *16,000 *16,000 *13,500 *13,500 *13,500

*5900

*5900

*5900

Lower (std UC) – f. stabilizer & r. dozer up

18,200 17,000 12,700 11,700 11,100

8400

8300

7900

5900

*5900

*5900

4700

Lower (std UC) – f. stabilizer & r. dozer down

*21,200 *21,200 20,600 *16,000 *16,000 13,200 *13,500 *13,500

9300

*5900

*5900

*5900

Lower (std UC) – f. dozer & r. stabilizer up

18,800 16,400 12,700 12,100 10,700

8400

8600

7600

5900

*5900

*5900

4700

Lower (std UC) – f. dozer & r. stabilizer down

*21,200 *21,200 *21,200 *16,000 *16,000 13,600 *13,500 *13,500

9600

*5900

*5900

*5900

Lower (std UC) – 2 sets stabilizersup

18,700 16,900 12,800 12,000 11,000

8500

8500

7800

6000

*5900

*5900

4800

Lower (std UC) – 2 sets stabilizersdown

*21,200 *21,200 *21,200 *16,000 *16,000 *16,000 *13,500 *13,500 11,500

*5900

*5900

*5900

5 ft

MH – stabilizers up – solid tires

17,200 17,200 12,200 11,400 11,400

8300

8200

8200

6000

*6100

*6100

4800

28.77

MH – stabilizers down – solid tires

*24,600 *24,600 *24,600 *17,700 *17,700 *17,700 *14,200 *14,200 13,400

*6100

*6100

*6100

Lower (std UC) – f. stabilizer & r. dozer up

16,900 15,800 11,600 11,100 10,500

7800

8000

7600

5700

*6100

*6100

4500

Lower (std UC) – f. stabilizer & r. dozer down

*24,600 *24,600 19,300 *17,700 *17,700 12,600 *14,200 *14,200

9100

*6100

*6100

*6100

Lower (std UC) – f. dozer & r. stabilizer up

17,600 15,200 11,600 11,500 10,100

7800

8300

7300

5700

*6100

5900

4500

Lower (std UC) – f. dozer & r. stabilizer down

*24,600 *24,600 20,000 *17,700 *17,700 12,900 *14,200 13,500

9300

*6100

*6100

*6100

Lower (std UC) – 2 sets stabilizersup

17,400 15,700 11,700 11,500 10,400

7900

8300

7600

5700

*6100

6100

4600

Lower (std UC) – 2 sets stabilizersdown

*24,600 *24,600 *24,600 *17,700 *17,700 15,600 *14,200 14,000 11,200

*6100

*6100

*6100

0 ft

MH – stabilizers up – solid tires

16,500 16,500 11,600 11,000 11,000

7900

8000

8000

5800

*6700

*6700

4900

28.15

MH – stabilizers down – solid tires

*25,700 *25,700 *25,700 *18,500 *18,500 18,500 *14,400 *14,400 13,200

*6700

*6700

*6700

Lower (std UC) – f. stabilizer & r. dozer up

16,300 15,100 11,000 10,700 10,100

7400

7800

7400

5500

6600

6300

4600

Lower (std UC) – f. stabilizer & r. dozer down

*25,700 *25,700 18,600 *18,500 *18,500 12,100 *14,400 *14,400

8800

*6700

*6700

*6700

Lower (std UC) – f. dozer & r. stabilizer up

16,900 14,500 11,000 11,100

9700

7400

8100

7100

5500

*6700

6000

4600

Lower (std UC) – f. dozer & r. stabilizer down

*25,700 *25,700 19,300 *18,500 *18,500 12,500 *14,400 13,300

9100

*6700

*6700

*6700

Lower (std UC) – 2 sets stabilizersup

16,800 15,000 11,100 11,000 10,000

7500

8000

7300

5500

*6700

6200

4700

Lower (std UC) – 2 sets stabilizersdown

*25,700 *25,700 23,900 *18,500 *18,500 15,200 *14,400 13,700 10,900

*6700

*6700

*6700

–5 ft

MH – stabilizers up – solid tires

*21,000 *21,000 *21,000 16,400 16,400 11,400 10,800 10,800

7700

7900

7900

5700

7400

7400

5300

26.51

MH – stabilizers down – solid tires

*21,000 *21,000 *21,000 *24,400 *24,400 *24,400 *18,000 *18,000 *18,000 *13,500 *13,500 13,100

*7700

*7700

*7700

Lower (std UC) – f. stabilizer & r. dozer up

*21,000 *21,000 20,000 16,100 14,900 10,800 10,500

9900

7300

7700

7300

5400

7100

6800

5000

Lower (std UC) – f. stabilizer & r. dozer down

*21,000 *21,000 *21,000 *24,400 *24,400 18,400 *18,000 *18,000 12,000 *13,500 *13,500

8700

*7700

*7700

*7700

Lower (std UC) – f. dozer & r. stabilizer up

*21,000 *21,000 20,000 16,700 14,300 10,800 10,900

9500

7300

8000

7000

5400

7400

6500

5000

Lower (std UC) – f. dozer & r. stabilizer down

*21,000 *21,000 *21,000 *24,400 *24,400 19,100 *18,000 *18,000 12,300 *13,500 13,200

9000

*7700

*7700

*7700

Lower (std UC) – 2 sets stabilizersup

*21,000 *21,000 20,300 16,600 14,800 10,900 10,800

9800

7400

8000

7300

5500

7400

6700

5100

Lower (std UC) – 2 sets stabilizersdown

*21,000 *21,000 *21,000 *24,400 *24,400 23,700 *18,000 *18,000 15,000 *13,500 *13,500 10,800

*7700

*7700

*7700

–10 ft

MH – stabilizers up – solid tires

*28,600 *28,600 21,500 16,500 16,500 11,500 10,800 10,800

7700

8700

8700

6300

23.69

MH – stabilizers down – solid tires

*28,600 *28,600 *28,600 *21,100 *21,100 *21,100 *15,600 *15,600 *15,600

*9700

*9700

*9700

Lower (std UC) – f. stabilizer & r. dozer up

*28,600 *28,600 20,400 16,200 15,100 10,900 10,600 10,000

7300

8400

8000

5900

Lower (std UC) – f. stabilizer & r. dozer down

*28,600 *28,600 *28,600 *21,100 *21,100 18,500 *15,600 *15,600 12,000

*9700

*9700

9600

Lower (std UC) – f. dozer & r. stabilizer up

*28,600 28,300 20,400 16,800 14,500 10,900 11,000

9600

7300

8800

7700

5900

Lower (std UC) – f. dozer & r. stabilizer down

*28,600 *28,600 *28,600 *21,100 *21,100 19,200 *15,600 *15,600 12,400

*9700

*9700

*9700

Lower (std UC) – 2 sets stabilizersup

*28,600 *28,600 20,600 16,700 15,000 11,100 10,900

9900

7400

8700

8000

6000

Lower (std UC) – 2 sets stabilizersdown

*28,600 *28,600 *28,600 *21,100 *21,100 *21,100 *15,600 *15,600 15,000

*9700

*9700

*9700

–15 ft

MH – stabilizers up – solid tires

*14,500 *14,500 12,000

MH – stabilizers down – solid tires

*14,500 *14,500 *14,500

Lower (std UC) – f. stabilizer & r. dozer up

*14,500 *14,500 11,400

Lower (std UC) – f. stabilizer & r. dozer down

*14,500 *14,500 *14,500

Lower (std UC) – f. dozer & r. stabilizer up

*14,500 *14,500 11,400

Lower (std UC) – f. dozer & r. stabilizer down

*14,500 *14,500 *14,500

Lower (std UC) – 2 sets stabilizersup

*14,500 *14,500 11,500

Lower (std UC) – 2 sets stabilizersdown

*14,500 *14,500 *14,500

*Limited by hydraulic rather than tipping load.

Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating

axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface. For lifting capacity including bucket and/or quick coupler, the respective weight has to be subtracted from

above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance.

Always refer to the appropriate Operation and Maintenance Manual for specific product information.