Edition 47 9-57
Material Handlers
9
Lifting Capacities
●
MH3024
(Grenoble Sourced)
Lift Capacities
All values are in lb, bucket cylinder and linkage installed, hydraulic cab riser, work tool: none, with counterweight (9040 lb), heavy lift on.
Load point height
Load over front
Load over rear
Load over side
Load at maximum reach (sticknose/bucket pin)
Undercarriage
Boom
Stick
MH or Standard
VA
8'2"
Undercarriage configuration
10 ft
15 ft
20 ft
25 ft
ft
25 ft
MH – stabilizers up – solid tires
*8600
*8600
*8600
18.83
MH – stabilizers down – solid tires
*8600
*8600
*8600
Lower (std UC) – f. stabilizer & r. dozer up
*8600
*8600
*8600
Lower (std UC) – f. stabilizer & r. dozer down
*8600
*8600
*8600
Lower (std UC) – f. dozer & r. stabilizer up
*8600
*8600
*8600
Lower (std UC) – f. dozer & r. stabilizer down
*8600
*8600
*8600
Lower (std UC) – 2 sets stabilizersup
*8600
*8600
*8600
Lower (std UC) – 2 sets stabilizersdown
*8600
*8600
*8600
20 ft
MH – stabilizers up – solid tires
12,900 12,900
9600
*7400
*7400
7400
23.03
MH – stabilizers down – solid tires
*14,800 *14,800 *14,800
*7400
*7400
*7400
Lower (std UC) – f. stabilizer & r. dozer up
12,600 11,900
9200
*7400
*7400
7000
Lower (std UC) – f. stabilizer & r. dozer down
*14,800 *14,800 14,100
*7400
*7400
*7400
Lower (std UC) – f. dozer & r. stabilizer up
13,000 11,500
9200
*7400
*7400
7000
Lower (std UC) – f. dozer & r. stabilizer down
*14,800 *14,800 14,500
*7400
*7400
*7400
Lower (std UC) – 2 sets stabilizersup
13,000 11,900
9300
*7400
*7400
7100
Lower (std UC) – 2 sets stabilizersdown
*14,800 *14,800 *14,800
*7400
*7400
*7400
15 ft
MH – stabilizers up – solid tires
*18,900 *18,900 14,400 12,500 12,500
9300
8700
8700
6400
*7000
*7000
6100
25.56
MH – stabilizers down – solid tires
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*7000
*7000
*7000
Lower (std UC) – f. stabilizer & r. dozer up
*18,900 18,300 13,800 12,300 11,600
8800
8500
8000
6100
*7000
*7000
5800
Lower (std UC) – f. stabilizer & r. dozer down
*18,900 *18,900 *18,900 *15,400 *15,400 13,800 *10,700 *10,700
9500
*7000
*7000
*7000
Lower (std UC) – f. dozer & r. stabilizer up
*18,900 17,700 13,800 12,700 11,200
8800
8800
7700
6100
*7000
*7000
5800
Lower (std UC) – f. dozer & r. stabilizer down
*18,900 *18,900 *18,900 *15,400 *15,400 14,200 *10,700 *10,700
9800
*7000
*7000
*7000
Lower (std UC) – 2 sets stabilizersup
*18,900 18,200 14,000 12,600 11,600
8900
8700
8000
6100
*7000
*7000
5900
Lower (std UC) – 2 sets stabilizersdown
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*7000
*7000
*7000
10 ft
MH – stabilizers up – solid tires
18,400 18,400 13,200 12,000 12,000
8700
8500
8500
6200
*6900
*6900
5500
26.87
MH – stabilizers down – solid tires
*22,700 *22,700 *22,700 *16,300 *16,300 *16,300 *13,000 *13,000 *13,000
*6900
*6900
*6900
Lower (std UC) – f. stabilizer & r. dozer up
18,200 16,900 12,600 11,700 11,100
8300
8300
7900
5900
*6900
*6900
5200
Lower (std UC) – f. stabilizer & r. dozer down
*22,700 *22,700 20,600 *16,300 *16,300 13,200 *13,000 *13,000
9400
*6900
*6900
*6900
Lower (std UC) – f. dozer & r. stabilizer up
18,800 16,300 12,600 12,100 10,700
8300
8600
7600
5900
*6900
6700
5200
Lower (std UC) – f. dozer & r. stabilizer down
*22,700 *22,700 21,300 *16,300 *16,300 13,600 *13,000 *13,000
9600
*6900
*6900
*6900
Lower (std UC) – 2 sets stabilizersup
18,700 16,800 12,700 12,100 11,000
8400
8500
7800
6000
*6900
*6900
5300
Lower (std UC) – 2 sets stabilizersdown
*22,700 *22,700 *22,700 *16,300 *16,300 *16,300 *13,000 *13,000 11,500
*6900
*6900
*6900
5 ft
MH – stabilizers up – solid tires
17,200 17,200 12,100 11,400 11,400
8200
8300
8300
6000
*7100
*7100
5300
27.17
MH – stabilizers down – solid tires
*25,300 *25,300 *25,300 *17,800 *17,800 *17,800 *13,600 *13,600 13,500
*7100
*7100
*7100
Lower (std UC) – f. stabilizer & r. dozer up
16,900 15,700 11,500 11,100 10,500
7800
8000
7600
5600
7100
6700
5000
Lower (std UC) – f. stabilizer & r. dozer down
*25,300 *25,300 19,300 *17,800 *17,800 12,600 *13,600 *13,600
9100
*7100
*7100
*7100
Lower (std UC) – f. dozer & r. stabilizer up
17,600 15,100 11,500 11,600 10,100
7800
8400
7300
5600
*7100
6400
5000
Lower (std UC) – f. dozer & r. stabilizer down
*25,300 *25,300 20,000 *17,800 *17,800 13,000 *13,600 *13,600
9400
*7100
*7100
*7100
Lower (std UC) – 2 sets stabilizersup
17,400 15,600 11,600 11,500 10,400
7900
8300
7600
5700
*7100
6700
5000
Lower (std UC) – 2 sets stabilizersdown
*25,300 *25,300 24,800 *17,800 *17,800 15,800 *13,600 *13,600 11,200
*7100
*7100
*7100
0 ft
MH – stabilizers up – solid tires
16,600 16,600 11,600 11,000 11,000
7900
8100
8100
5800
7500
7500
5400
26.48
MH – stabilizers down – solid tires
*25,300 *25,300 *25,300 *18,400 *18,400 *18,400 *14,100 *14,100 13,300
*7700
*7700
*7700
Lower (std UC) – f. stabilizer & r. dozer up
16,300 15,200 11,000 10,800 10,100
7400
7900
7400
5500
7300
6900
5100
Lower (std UC) – f. stabilizer & r. dozer down
*25,300 *25,300 18,700 *18,400 *18,400 12,200 *14,100 *14,100
8900
*7700
*7700
*7700
Lower (std UC) – f. dozer & r. stabilizer up
17,000 14,600 11,000 11,200
9700
7400
8200
7100
5500
7600
6600
5100
Lower (std UC) – f. dozer & r. stabilizer down
*25,300 *25,300 19,400 *18,400 *18,400 12,600 *14,100 13,500
9200
*7700
*7700
*7700
Lower (std UC) – 2 sets stabilizersup
16,900 15,100 11,100 11,100 10,100
7500
8100
7400
5600
7500
6800
5100
Lower (std UC) – 2 sets stabilizersdown
*25,300 *25,300 24,100 *18,400 *18,400 15,300 *14,100 13,900 11,100
*7700
*7700
*7700
–5 ft
MH – stabilizers up – solid tires
*22,800 *22,800 21,300 16,500 16,500 11,500 10,900 10,900
7700
8200
8200
5900
24.74
MH – stabilizers down – solid tires
*22,800 *22,800 *22,800 *23,000 *23,000 *23,000 *17,100 *17,100 *17,100
*8900
*8900
*8900
Lower (std UC) – f. stabilizer & r. dozer up
*22,800 *22,800 20,200 16,200 15,100 10,900 10,600 10,000
7300
8000
7600
5600
Lower (std UC) – f. stabilizer & r. dozer down
*22,800 *22,800 *22,800 *23,000 *23,000 18,600 *17,100 *17,100 12,100
*8900
*8900
*8900
Lower (std UC) – f. dozer & r. stabilizer up
*22,800 *22,800 20,200 16,900 14,500 10,900 11,100
9600
7300
8300
7300
5600
Lower (std UC) – f. dozer & r. stabilizer down
*22,800 *22,800 *22,800 *23,000 *23,000 19,300 *17,100 *17,100 12,500
*8900
*8900
*8900
Lower (std UC) – 2 sets stabilizersup
*22,800 *22,800 20,500 16,800 15,000 11,000 11,000
9900
7400
8300
7500
5700
Lower (std UC) – 2 sets stabilizersdown
*22,800 *22,800 *22,800 *23,000 *23,000 *23,000 *17,100 *17,100 15,200
*8900
*8900
*8900
–10 ft
MH – stabilizers up – solid tires
16,700 16,700 11,700 11,100 11,100
7900
MH – stabilizers down – solid tires
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
Lower (std UC) – f. stabilizer & r. dozer up
16,500 15,300 11,100 10,800 10,200
7500
Lower (std UC) – f. stabilizer & r. dozer down
*18,300 *18,300 *18,300 *13,000 *13,000 12,300
Lower (std UC) – f. dozer & r. stabilizer up
17,100 14,700 11,100 11,200
9800
7500
Lower (std UC) – f. dozer & r. stabilizer down
*18,300 *18,300 *18,300 *13,000 *13,000 12,700
Lower (std UC) – 2 sets stabilizersup
17,000 15,200 11,200 11,200 10,100
7600
Lower (std UC) – 2 sets stabilizersdown
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
*Limited by hydraulic rather than tipping load.
Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating
axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface and the Variable Boom Cylinder adjusted to the maximum length. For lifting capacity including bucket and/or
quick coupler, the respective weight has to be subtracted from above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance.
Always refer to the appropriate Operation and Maintenance Manual for specific product information.




