Table of Contents Table of Contents
Previous Page  702 / 2440 Next Page
Information
Show Menu
Previous Page 702 / 2440 Next Page
Page Background

Edition 47 9-57

Material Handlers

9

Lifting Capacities

MH3024

(Grenoble Sourced)

Lift Capacities

All values are in lb, bucket cylinder and linkage installed, hydraulic cab riser, work tool: none, with counterweight (9040 lb), heavy lift on.

Load point height

Load over front

Load over rear

Load over side

Load at maximum reach (sticknose/bucket pin)

Undercarriage

Boom

Stick

MH or Standard

VA

8'2"

Undercarriage configuration

10 ft

15 ft

20 ft

25 ft

ft

25 ft

MH – stabilizers up – solid tires

*8600

*8600

*8600

18.83

MH – stabilizers down – solid tires

*8600

*8600

*8600

Lower (std UC) – f. stabilizer & r. dozer up

*8600

*8600

*8600

Lower (std UC) – f. stabilizer & r. dozer down

*8600

*8600

*8600

Lower (std UC) – f. dozer & r. stabilizer up

*8600

*8600

*8600

Lower (std UC) – f. dozer & r. stabilizer down

*8600

*8600

*8600

Lower (std UC) – 2 sets stabilizersup

*8600

*8600

*8600

Lower (std UC) – 2 sets stabilizersdown

*8600

*8600

*8600

20 ft

MH – stabilizers up – solid tires

12,900 12,900

9600

*7400

*7400

7400

23.03

MH – stabilizers down – solid tires

*14,800 *14,800 *14,800

*7400

*7400

*7400

Lower (std UC) – f. stabilizer & r. dozer up

12,600 11,900

9200

*7400

*7400

7000

Lower (std UC) – f. stabilizer & r. dozer down

*14,800 *14,800 14,100

*7400

*7400

*7400

Lower (std UC) – f. dozer & r. stabilizer up

13,000 11,500

9200

*7400

*7400

7000

Lower (std UC) – f. dozer & r. stabilizer down

*14,800 *14,800 14,500

*7400

*7400

*7400

Lower (std UC) – 2 sets stabilizersup

13,000 11,900

9300

*7400

*7400

7100

Lower (std UC) – 2 sets stabilizersdown

*14,800 *14,800 *14,800

*7400

*7400

*7400

15 ft

MH – stabilizers up – solid tires

*18,900 *18,900 14,400 12,500 12,500

9300

8700

8700

6400

*7000

*7000

6100

25.56

MH – stabilizers down – solid tires

*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700

*7000

*7000

*7000

Lower (std UC) – f. stabilizer & r. dozer up

*18,900 18,300 13,800 12,300 11,600

8800

8500

8000

6100

*7000

*7000

5800

Lower (std UC) – f. stabilizer & r. dozer down

*18,900 *18,900 *18,900 *15,400 *15,400 13,800 *10,700 *10,700

9500

*7000

*7000

*7000

Lower (std UC) – f. dozer & r. stabilizer up

*18,900 17,700 13,800 12,700 11,200

8800

8800

7700

6100

*7000

*7000

5800

Lower (std UC) – f. dozer & r. stabilizer down

*18,900 *18,900 *18,900 *15,400 *15,400 14,200 *10,700 *10,700

9800

*7000

*7000

*7000

Lower (std UC) – 2 sets stabilizersup

*18,900 18,200 14,000 12,600 11,600

8900

8700

8000

6100

*7000

*7000

5900

Lower (std UC) – 2 sets stabilizersdown

*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700

*7000

*7000

*7000

10 ft

MH – stabilizers up – solid tires

18,400 18,400 13,200 12,000 12,000

8700

8500

8500

6200

*6900

*6900

5500

26.87

MH – stabilizers down – solid tires

*22,700 *22,700 *22,700 *16,300 *16,300 *16,300 *13,000 *13,000 *13,000

*6900

*6900

*6900

Lower (std UC) – f. stabilizer & r. dozer up

18,200 16,900 12,600 11,700 11,100

8300

8300

7900

5900

*6900

*6900

5200

Lower (std UC) – f. stabilizer & r. dozer down

*22,700 *22,700 20,600 *16,300 *16,300 13,200 *13,000 *13,000

9400

*6900

*6900

*6900

Lower (std UC) – f. dozer & r. stabilizer up

18,800 16,300 12,600 12,100 10,700

8300

8600

7600

5900

*6900

6700

5200

Lower (std UC) – f. dozer & r. stabilizer down

*22,700 *22,700 21,300 *16,300 *16,300 13,600 *13,000 *13,000

9600

*6900

*6900

*6900

Lower (std UC) – 2 sets stabilizersup

18,700 16,800 12,700 12,100 11,000

8400

8500

7800

6000

*6900

*6900

5300

Lower (std UC) – 2 sets stabilizersdown

*22,700 *22,700 *22,700 *16,300 *16,300 *16,300 *13,000 *13,000 11,500

*6900

*6900

*6900

5 ft

MH – stabilizers up – solid tires

17,200 17,200 12,100 11,400 11,400

8200

8300

8300

6000

*7100

*7100

5300

27.17

MH – stabilizers down – solid tires

*25,300 *25,300 *25,300 *17,800 *17,800 *17,800 *13,600 *13,600 13,500

*7100

*7100

*7100

Lower (std UC) – f. stabilizer & r. dozer up

16,900 15,700 11,500 11,100 10,500

7800

8000

7600

5600

7100

6700

5000

Lower (std UC) – f. stabilizer & r. dozer down

*25,300 *25,300 19,300 *17,800 *17,800 12,600 *13,600 *13,600

9100

*7100

*7100

*7100

Lower (std UC) – f. dozer & r. stabilizer up

17,600 15,100 11,500 11,600 10,100

7800

8400

7300

5600

*7100

6400

5000

Lower (std UC) – f. dozer & r. stabilizer down

*25,300 *25,300 20,000 *17,800 *17,800 13,000 *13,600 *13,600

9400

*7100

*7100

*7100

Lower (std UC) – 2 sets stabilizersup

17,400 15,600 11,600 11,500 10,400

7900

8300

7600

5700

*7100

6700

5000

Lower (std UC) – 2 sets stabilizersdown

*25,300 *25,300 24,800 *17,800 *17,800 15,800 *13,600 *13,600 11,200

*7100

*7100

*7100

0 ft

MH – stabilizers up – solid tires

16,600 16,600 11,600 11,000 11,000

7900

8100

8100

5800

7500

7500

5400

26.48

MH – stabilizers down – solid tires

*25,300 *25,300 *25,300 *18,400 *18,400 *18,400 *14,100 *14,100 13,300

*7700

*7700

*7700

Lower (std UC) – f. stabilizer & r. dozer up

16,300 15,200 11,000 10,800 10,100

7400

7900

7400

5500

7300

6900

5100

Lower (std UC) – f. stabilizer & r. dozer down

*25,300 *25,300 18,700 *18,400 *18,400 12,200 *14,100 *14,100

8900

*7700

*7700

*7700

Lower (std UC) – f. dozer & r. stabilizer up

17,000 14,600 11,000 11,200

9700

7400

8200

7100

5500

7600

6600

5100

Lower (std UC) – f. dozer & r. stabilizer down

*25,300 *25,300 19,400 *18,400 *18,400 12,600 *14,100 13,500

9200

*7700

*7700

*7700

Lower (std UC) – 2 sets stabilizersup

16,900 15,100 11,100 11,100 10,100

7500

8100

7400

5600

7500

6800

5100

Lower (std UC) – 2 sets stabilizersdown

*25,300 *25,300 24,100 *18,400 *18,400 15,300 *14,100 13,900 11,100

*7700

*7700

*7700

–5 ft

MH – stabilizers up – solid tires

*22,800 *22,800 21,300 16,500 16,500 11,500 10,900 10,900

7700

8200

8200

5900

24.74

MH – stabilizers down – solid tires

*22,800 *22,800 *22,800 *23,000 *23,000 *23,000 *17,100 *17,100 *17,100

*8900

*8900

*8900

Lower (std UC) – f. stabilizer & r. dozer up

*22,800 *22,800 20,200 16,200 15,100 10,900 10,600 10,000

7300

8000

7600

5600

Lower (std UC) – f. stabilizer & r. dozer down

*22,800 *22,800 *22,800 *23,000 *23,000 18,600 *17,100 *17,100 12,100

*8900

*8900

*8900

Lower (std UC) – f. dozer & r. stabilizer up

*22,800 *22,800 20,200 16,900 14,500 10,900 11,100

9600

7300

8300

7300

5600

Lower (std UC) – f. dozer & r. stabilizer down

*22,800 *22,800 *22,800 *23,000 *23,000 19,300 *17,100 *17,100 12,500

*8900

*8900

*8900

Lower (std UC) – 2 sets stabilizersup

*22,800 *22,800 20,500 16,800 15,000 11,000 11,000

9900

7400

8300

7500

5700

Lower (std UC) – 2 sets stabilizersdown

*22,800 *22,800 *22,800 *23,000 *23,000 *23,000 *17,100 *17,100 15,200

*8900

*8900

*8900

–10 ft

MH – stabilizers up – solid tires

16,700 16,700 11,700 11,100 11,100

7900

MH – stabilizers down – solid tires

*18,300 *18,300 *18,300 *13,000 *13,000 *13,000

Lower (std UC) – f. stabilizer & r. dozer up

16,500 15,300 11,100 10,800 10,200

7500

Lower (std UC) – f. stabilizer & r. dozer down

*18,300 *18,300 *18,300 *13,000 *13,000 12,300

Lower (std UC) – f. dozer & r. stabilizer up

17,100 14,700 11,100 11,200

9800

7500

Lower (std UC) – f. dozer & r. stabilizer down

*18,300 *18,300 *18,300 *13,000 *13,000 12,700

Lower (std UC) – 2 sets stabilizersup

17,000 15,200 11,200 11,200 10,100

7600

Lower (std UC) – 2 sets stabilizersdown

*18,300 *18,300 *18,300 *13,000 *13,000 *13,000

*Limited by hydraulic rather than tipping load.

Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating

axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface and the Variable Boom Cylinder adjusted to the maximum length. For lifting capacity including bucket and/or

quick coupler, the respective weight has to be subtracted from above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance.

Always refer to the appropriate Operation and Maintenance Manual for specific product information.