Table of Contents Table of Contents
Previous Page  706 / 2440 Next Page
Information
Show Menu
Previous Page 706 / 2440 Next Page
Page Background

Edition 47 9-61

Material Handlers

9

Lifting Capacities

MH3024

(Grenoble Sourced)

Lift Capacities

All values are in lb, bucket cylinder and linkage installed, hydraulic cab riser, work tool: none, with counterweight (9040 lb), heavy lift on.

Load point height

Load over front

Load over rear

Load over side

Load at maximum reach (sticknose/bucket pin)

Undercarriage

Boom

Stick

MH or Standard

VA

9'6"

Undercarriage configuration

10 ft

15 ft

20 ft

25 ft

ft

30 ft

MH – stabilizers up – solid tires

*9500

*9500

*9500

13.94

MH – stabilizers down – solid tires

*9500

*9500

*9500

Lower (std UC) – f. stabilizer & r. dozer up

*9500

*9500

*9500

Lower (std UC) – f. stabilizer & r. dozer down

*9500

*9500

*9500

Lower (std UC) – f. dozer & r. stabilizer up

*9500

*9500

*9500

Lower (std UC) – f. dozer & r. stabilizer down

*9500

*9500

*9500

Lower (std UC) – 2 sets stabilizersup

*9500

*9500

*9500

Lower (std UC) – 2 sets stabilizersdown

*9500

*9500

*9500

25 ft

MH – stabilizers up – solid tires

*9800

*9800

9600

*7000

*7000

*7000

20.67

MH – stabilizers down – solid tires

*9800

*9800

*9800

*7000

*7000

*7000

Lower (std UC) – f. stabilizer & r. dozer up

*9800

*9800

9200

*7000

*7000

*7000

Lower (std UC) – f. stabilizer & r. dozer down

*9800

*9800

*9800

*7000

*7000

*7000

Lower (std UC) – f. dozer & r. stabilizer up

*9800

*9800

9200

*7000

*7000

*7000

Lower (std UC) – f. dozer & r. stabilizer down

*9800

*9800

*9800

*7000

*7000

*7000

Lower (std UC) – 2 sets stabilizersup

*9800

*9800

9300

*7000

*7000

*7000

Lower (std UC) – 2 sets stabilizersdown

*9800

*9800

*9800

*7000

*7000

*7000

20 ft

MH – stabilizers up – solid tires

13,000 13,000

9700

*6100

*6100

*6100

24.54

MH – stabilizers down – solid tires

*13,800 *13,800 *13,800

*6100

*6100

*6100

Lower (std UC) – f. stabilizer & r. dozer up

12,800 12,100

9300

*6100

*6100

*6100

Lower (std UC) – f. stabilizer & r. dozer down

*13,800 *13,800 *13,800

*6100

*6100

*6100

Lower (std UC) – f. dozer & r. stabilizer up

13,200 11,700

9300

*6100

*6100

*6100

Lower (std UC) – f. dozer & r. stabilizer down

*13,800 *13,800 *13,800

*6100

*6100

*6100

Lower (std UC) – 2 sets stabilizersup

13,100 12,000

9400

*6100

*6100

*6100

Lower (std UC) – 2 sets stabilizersdown

*13,800 *13,800 *13,800

*6100

*6100

*6100

15 ft

MH – stabilizers up – solid tires

*17,000 *17,000 14,700 12,600 12,600

9400

8800

8800

6400

*5800

*5800

5600

26.90

MH – stabilizers down – solid tires

*17,000 *17,000 *17,000 *14,800 *14,800 *14,800 *12,200 *12,200 *12,200

*5800

*5800

*5800

Lower (std UC) – f. stabilizer & r. dozer up

*17,000 *17,000 14,100 12,400 11,700

8900

8500

8100

6100

*5800

*5800

5300

Lower (std UC) – f. stabilizer & r. dozer down

*17,000 *17,000 *17,000 *14,800 *14,800 13,900 *12,200 *12,200

9600

*5800

*5800

*5800

Lower (std UC) – f. dozer & r. stabilizer up

*17,000 *17,000 14,100 12,800 11,300

8900

8900

7800

6100

*5800

*5800

5300

Lower (std UC) – f. dozer & r. stabilizer down

*17,000 *17,000 *17,000 *14,800 *14,800 14,300 *12,200 *12,200

9900

*5800

*5800

*5800

Lower (std UC) – 2 sets stabilizersup

*17,000 *17,000 14,200 12,700 11,700

9000

8800

8100

6200

*5800

*5800

5400

Lower (std UC) – 2 sets stabilizersdown

*17,000 *17,000 *17,000 *14,800 *14,800 *14,800 *12,200 *12,200 11,800

*5800

*5800

*5800

10 ft

MH – stabilizers up – solid tires

18,700 18,700 13,400 12,000 12,000

8800

8500

8500

6200

*5700

*5700

5000

28.15

MH – stabilizers down – solid tires

*21,500 *21,500 *21,500 *15,800 *15,800 *15,800 *12,600 *12,600 *12,600

*5700

*5700

*5700

Lower (std UC) – f. stabilizer & r. dozer up

18,400 17,200 12,800 11,800 11,100

8400

8300

7900

5900

*5700

*5700

4800

Lower (std UC) – f. stabilizer & r. dozer down

*21,500 *21,500 20,900 *15,800 *15,800 13,300 *12,600 *12,600

9400

*5700

*5700

*5700

Lower (std UC) – f. dozer & r. stabilizer up

19,100 16,600 12,800 12,200 10,700

8400

8600

7600

5900

*5700

*5700

4800

Lower (std UC) – f. dozer & r. stabilizer down

*21,500 *21,500 *21,500 *15,800 *15,800 13,700 *12,600 *12,600

9600

*5700

*5700

*5700

Lower (std UC) – 2 sets stabilizersup

19,000 17,100 12,900 12,100 11,100

8500

8600

7800

6000

*5700

*5700

4800

Lower (std UC) – 2 sets stabilizersdown

*21,500 *21,500 *21,500 *15,800 *15,800 *15,800 *12,600 *12,600 11,500

*5700

*5700

*5700

5 ft

MH – stabilizers up – solid tires

17,300 17,300 12,200 11,400 11,400

8200

8200

8200

5900

*5900

*5900

4800

28.44

MH – stabilizers down – solid tires

*24,700 *24,700 *24,700 *17,200 *17,200 *17,200 *13,200 *13,200 *13,200

*5900

*5900

*5900

Lower (std UC) – f. stabilizer & r. dozer up

17,100 15,800 11,600 11,200 10,500

7800

8000

7600

5600

*5900

*5900

4600

Lower (std UC) – f. stabilizer & r. dozer down

*24,700 *24,700 19,500 *17,200 *17,200 12,700 *13,200 *13,200

9100

*5900

*5900

*5900

Lower (std UC) – f. dozer & r. stabilizer up

17,700 15,200 11,600 11,600 10,100

7800

8300

7300

5600

*5900

*5900

4600

Lower (std UC) – f. dozer & r. stabilizer down

*24,700 *24,700 20,200 *17,200 *17,200 13,000 *13,200 *13,200

9300

*5900

*5900

*5900

Lower (std UC) – 2 sets stabilizersup

17,600 15,800 11,700 11,500 10,500

7900

8300

7500

5700

*5900

*5900

4600

Lower (std UC) – 2 sets stabilizersdown

*24,700 *24,700 *24,700 *17,200 *17,200 15,800 *13,200 *13,200 11,200

*5900

*5900

*5900

0 ft

MH – stabilizers up – solid tires

16,600 16,600 11,500 11,000 11,000

7800

8000

8000

5700

*6300

*6300

4900

27.79

MH – stabilizers down – solid tires

*25,400 *25,400 *25,400 *18,400 *18,400 *18,400 *14,000 *14,000 13,300

*6300

*6300

*6300

Lower (std UC) – f. stabilizer & r. dozer up

16,300 15,100 10,900 10,700 10,100

7400

7800

7400

5400

*6300

*6300

4600

Lower (std UC) – f. stabilizer & r. dozer down

*25,400 *25,400 18,700 *18,400 *18,400 12,200 *14,000 *14,000

8800

*6300

*6300

*6300

Lower (std UC) – f. dozer & r. stabilizer up

16,900 14,500 10,900 11,100

9700

7400

8100

7100

5400

*6300

6100

4600

Lower (std UC) – f. dozer & r. stabilizer down

*25,400 *25,400 19,400 *18,400 *18,400 12,600 *14,000 13,400

9100

*6300

*6300

*6300

Lower (std UC) – 2 sets stabilizersup

16,800 15,000 11,000 11,100 10,000

7500

8000

7300

5500

*6300

6300

4700

Lower (std UC) – 2 sets stabilizersdown

*25,400 *25,400 24,100 *18,400 *18,400 15,300 *14,000 13,800 11,000

*6300

*6300

*6300

–5 ft

MH – stabilizers up – solid tires

*21,500 *21,500 20,900 16,300 16,300 11,300 10,800 10,800

7600

8000

8000

5700

*7200

*7200

5400

26.15

MH – stabilizers down – solid tires

*21,500 *21,500 *21,500 *23,700 *23,700 *23,700 *17,500 *17,500 *17,500 *12,800 *12,800 *12,800

*7200

*7200

*7200

Lower (std UC) – f. stabilizer & r. dozer up

*21,500 *21,500 19,800 16,100 14,900 10,700 10,500

9900

7200

7700

7300

5300

*7200

6900

5100

Lower (std UC) – f. stabilizer & r. dozer down

*21,500 *21,500 *21,500 *23,700 *23,700 18,400 *17,500 *17,500 12,000 *12,800 *12,800

8800

*7200

*7200

*7200

Lower (std UC) – f. dozer & r. stabilizer up

*21,500 *21,500 19,800 16,700 14,300 10,700 10,900

9500

7200

8000

7000

5300

*7200

6600

5100

Lower (std UC) – f. dozer & r. stabilizer down

*21,500 *21,500 *21,500 *23,700 *23,700 19,100 *17,500 *17,500 12,400 *12,800 *12,800

9000

*7200

*7200

*7200

Lower (std UC) – 2 sets stabilizersup

*21,500 *21,500 20,100 16,600 14,800 10,800 10,900

9800

7300

8000

7300

5400

*7200

6900

5100

Lower (std UC) – 2 sets stabilizersdown

*21,500 *21,500 *21,500 *23,700 *23,700 *23,700 *17,500 *17,500 15,100 *12,800 *12,800 10,900

*7200

*7200

*7200

–10 ft

MH – stabilizers up – solid tires

16,500 16,500 11,400 10,900 10,900

7700

MH – stabilizers down – solid tires

*19,700 *19,700 *19,700 *14,400 *14,400 *14,400

Lower (std UC) – f. stabilizer & r. dozer up

16,200 15,000 10,800 10,600 10,000

7300

Lower (std UC) – f. stabilizer & r. dozer down

*19,700 *19,700 18,600 *14,400 *14,400 12,100

Lower (std UC) – f. dozer & r. stabilizer up

16,900 14,500 10,800 11,000

9600

7300

Lower (std UC) – f. dozer & r. stabilizer down

*19,700 *19,700 19,300 *14,400 *14,400 12,400

Lower (std UC) – 2 sets stabilizersup

16,700 15,000 11,000 10,900

9900

7400

Lower (std UC) – 2 sets stabilizersdown

*19,700 *19,700 *19,700 *14,400 *14,400 *14,400

*Limited by hydraulic rather than tipping load.

Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating

axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface and the Variable Boom Cylinder adjusted to the maximum length. For lifting capacity including bucket and/or

quick coupler, the respective weight has to be subtracted from above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance.

Always refer to the appropriate Operation and Maintenance Manual for specific product information.